662 parameters, 384 swing factors, 506 price feeds and 925 listed tickers across 220 sub-industries, with 651 cited sources. Packs are versioned (latest review 5 Oct 2026) and the version a decision used is pinned to its record.

What is in every pack

Four layers, one baseline you can argue with.

A pack is not a benchmark report. It is the starting model for a project: ranges rather than points, the swings that usually move value, and where each number came from.

662 PARAMETERS

Sourced parameters

Capex intensity, build months, cost and schedule overrun, WACC, IRR, utilisation, margins and sector-specific values. Each has a low and high, an evidence kind (sourced, estimate or designed), a review date and a link to its source.

506 FEEDS · 925 TICKERS

Price feeds & market tickers

The commodity, rate and price series that move the case (FRED, EIA, World Bank, exchange tickers) and the listed operators, suppliers and customers whose prices react first.

384 SWING FACTORS

Swing factors

The swings that recur in the sector, each with a typical probability, cost and schedule impact, the shared factors that drive it, and the leading indicators to watch.

450 STEPS · 312 COST LINES

Project templates

A work breakdown with optimistic, most-likely and pessimistic durations, plus a cost breakdown that records how much of each line rides on steel, copper or electrical equipment.

The packs

37 industries, four groups.

Filter by group or search by sector, technology or sub-industry. Each brief shows the whole pack: parameters with sources, swing factors, signals, templates and where the evidence disagrees.

Energy & chemicals

Biofuels

Production of liquid and gaseous renewable fuels: 1G ethanol from cane/molasses and grain (maize, FCI rice, corn), 2G cellulosic ethanol, sustainable…

ethanol, SAF, biogas 1G ethanol - cane juice / B-heavy & C-heavy molasses 1G ethanol - grain (maize, FCI rice, damaged grain; US corn dry mill) 2G cellulosic ethanol (rice straw, bamboo, bagasse) SAF / renewable diesel via HEFA (hydroprocessed esters & fatty acids) SAF via alcohol-to-jet (ATJ) SAF via gasification + Fischer-Tropsch / e-SAF (PtL) Renewable diesel / HVO Compressed biogas (CBG) / RNG FAME biodiesel
Capex intensity
1.8 INR crore per KLPD
Build time
20 months
Cost overrun
15% mean
Read the brief
Energy & chemicals

Fertilizers & ammonia

Nitrogen (ammonia, urea, UAN, ammonium nitrate), phosphatic (DAP/NPK/TSP) and specialty fertilizers, plus low-carbon ammonia (blue with CCS, green…

Gas-based ammonia-urea complexes Coal/petcoke gasification-based urea DAP / NPK / phosphatic fertilizers Nano urea / nano DAP & specialty fertilizers Blue (low-carbon) ammonia with CCS Green (renewable) ammonia
Capex intensity
950 USD per tpa urea
Build time
45 months
Cost overrun
20% mean
Read the brief
Energy & chemicals

Green hydrogen & derivatives

Renewable (electrolytic) hydrogen made with alkaline, PEM and solid-oxide electrolysers, plus its derivatives: green ammonia, e-methanol and e-fuels.

Alkaline electrolysers (ALK / pressurised ALK) PEM electrolysers Solid oxide electrolysers (SOEC) Green ammonia e-Methanol & e-fuels (e-SAF) Electrolyser manufacturing (gigafactories)
Capex intensity
2,200 USD per kW electrolysis installed
Build time
30 months
Cost overrun
25% mean
Read the brief
Energy & chemicals

LNG

Liquefied natural gas value chain infrastructure: export liquefaction trains (large-scale onshore, mid-scale/modular, floating) and import…

liquefaction & regasification Large-scale onshore liquefaction trains (US Gulf Coast, Qatar, Canada) Mid-scale / modular liquefaction Floating LNG (FLNG) Floating storage & regasification units (FSRU) Onshore regasification terminals
Capex intensity
1,050 USD per tpa
Build time
48 months
Cost overrun
12% mean
Read the brief
Energy & chemicals

Midstream pipelines & city gas distribution

Long-distance gas transmission, crude and refined-product/NGL pipelines, compression and storage, plus India's city gas distribution (CGD) networks.

Natural gas transmission pipelines Crude oil pipelines Refined product, LPG & NGL pipelines City gas distribution (India CGD) Gas storage & compression Hydrogen-ready / hydrogen backbone pipelines (EU)
Capex intensity
3.6M USD per km
Build time
30 months
Cost overrun
25% mean
Read the brief
Energy & chemicals

Petrochemicals

Steam crackers (naphtha, ethane, LPG or dual/mixed feed) and on-purpose propylene units convert hydrocarbons into ethylene, propylene, butadiene and…

olefins, polymers & aromatics Naphtha steam cracker Ethane cracker (US Gulf / Middle East) Dual/mixed-feed cracker (refinery-integrated) Polyethylene (HDPE / LLDPE / swing / LDPE) Polypropylene (homo, random, impact copolymer) Mono-ethylene glycol (EO/EG) Butadiene extraction & synthetic rubber feed Aromatics (benzene/PX) & PTA PVC (EDC/VCM/PVC chain) On-purpose propylene (PDH / metathesis / high-severity FCC)
Capex intensity
4,000 USD per tpa ethylene
Build time
52 months
Cost overrun
35% mean
Read the brief
Energy & chemicals

Petroleum refining

Refineries separate and convert crude oil into fuels (gasoline, diesel, jet, LPG), feedstocks (naphtha, propylene, aromatics) and specialties…

Hydroskimming / topping refinery Cracking refinery (FCC / hydrocracker) Deep-conversion / coking refinery Refinery-petrochemical integration (crude-to-chemicals) Bitumen & lube base oils
Capex intensity
32,000 USD per bpd
Build time
48 months
Cost overrun
45% mean
Read the brief
Energy & chemicals

Specialty chemicals

Performance- and function-priced chemicals made in multi-step batch or semi-continuous plants: agrochemical actives and intermediates…

Agrochemicals (actives & intermediates, custom synthesis) Fluorochemicals & refrigerants Pharma intermediates / CDMO Performance polymers & additives Coatings, adhesives, sealants & construction chemicals Surfactants & personal-care ingredients Battery chemicals & electrolytes (optional)
Capex intensity
5,000 USD per tpa
Build time
24 months
Cost overrun
15% mean
Read the brief
Energy & chemicals

Upstream oil & gas

Exploration, appraisal, development and production of crude oil, condensate and natural gas, from short-cycle US shale wells (USD 8-11m per well…

E&P Onshore conventional fields (incl. EOR) US shale / tight oil Shallow-water offshore (shelf, fixed platforms) Deepwater / ultra-deepwater (FPSO, subsea) Gas field development (onshore/offshore, incl. LNG feed gas)
Capex intensity
40,000 USD per flowing boe/d
Build time
48 months
Cost overrun
20% mean
Read the brief
Power & digital

Data centres

Hyperscale self-build and leased capacity, wholesale/retail colocation, and gigawatt-scale AI training campuses (Stargate Abilene, Meta Hyperion, xAI…

hyperscale, colocation, AI training campuses Hyperscale self-build campuses Wholesale and retail colocation AI training / GPU 'AI factory' campuses incl. neoclouds Edge and enterprise data centres On-site / bridging power for data centres
Capex intensity
12 USD million per MW critical IT
Build time
20 months
Cost overrun
10% mean
Read the brief
Power & digital

Energy storage

Grid-scale lithium-ion (mostly LFP) battery energy storage systems for arbitrage, capacity and ancillary services; behind-the-meter C&I storage…

utility BESS, C&I storage, pumped hydro, long-duration Utility-scale Li-ion BESS (2-4 h LFP) C&I and behind-the-meter storage Pumped storage hydro (PSP, 6-10 h) Long-duration storage (iron-air, flow, CAES, thermal) Cell, DC block and PCS manufacturing / integration
Capex intensity
300 USD/kWh
Build time
12 months
Cost overrun
8% mean
Read the brief
Power & digital

EV & battery gigafactories

Lithium-ion cell gigafactories (LFP, NMC, emerging sodium-ion), upstream active materials (pCAM/CAM, graphite/silicon anodes), pack assembly and…

cell manufacturing, cathode/anode materials, EV OEM plants Li-ion cell gigafactories (LFP/NMC/LMFP, sodium-ion) Cathode (pCAM/CAM), anode and electrolyte plants EV and e-2W/3W vehicle assembly plants Battery pack/module assembly Battery recycling and black-mass refining
Capex intensity
90 USD million per GWh/yr
Build time
30 months
Cost overrun
25% mean
Read the brief
Power & digital

Nuclear power

Firm zero-carbon baseload from large light-water (AP1000, EPR, VVER, APR1400) and Indian PHWR-700 reactors, fast breeders (PFBR), small modular…

large LWR/PHWR, SMRs, restarts and life extensions Large LWR (AP1000, EPR/EPR2, APR1400, VVER-1200) Indian PHWR-700 fleet mode Small modular reactors (LW-SMR 50-470 MWe) Advanced non-LWR (sodium-fast, HTGR, molten salt, microreactors) Restarts, uprates and long-term operation
Capex intensity
9,000 USD/kW
Build time
96 months
Cost overrun
117% mean
Read the brief
Power & digital

Semiconductor manufacturing

Wafer fabrication (leading-edge logic, memory/HBM, mature-node and specialty/compound semiconductors) and back-end assembly, test, marking and…

front-end fabs, OSAT/ATMP, display & compound semis Leading-edge logic foundry fabs (N3/N2/18A and below) DRAM/HBM and NAND fabs Mature-node and specialty fabs (28-180 nm, power, analog, SiC/GaN) OSAT / ATMP and advanced packaging Display fabs, equipment-component and materials plants
Capex intensity
0.22M USD per WSPM
Build time
42 months
Cost overrun
25% mean
Read the brief
Power & digital

Solar PV

The largest single item of global energy investment (~USD 450bn in 2025), spanning utility-scale plants (fixed/tracker, increasingly hybridised with…

utility-scale, rooftop/C&I, module & cell manufacturing Utility-scale PV (single-axis tracker / fixed tilt) Rooftop and C&I / community solar PV + storage hybrids / FDRE Module assembly (TOPCon/HJT/bifacial) Cells, wafers, ingots and polysilicon
Capex intensity
900 USD/kWac
Build time
15 months
Cost overrun
1.3% mean
Read the brief
Power & digital

Telecom networks

Mobile radio access networks (5G NSA/SA, FWA), fibre-to-the-home and backbone/backhaul fibre, passive tower infrastructure, and subsea/terrestrial…

5G/6G RAN, fibre, towers, subsea cables Mobile RAN (5G/5G-SA, FWA, small cells) FTTH/FTTx access fibre Towers and passive infrastructure Long-haul, metro and data-centre interconnect fibre Subsea cable systems and landing stations
Capex intensity
20% of revenue
Build time
18 months
Cost overrun
10% mean
Read the brief
Power & digital

Thermal power generation

Dispatchable fossil generation: supercritical/ultra-supercritical coal (India's 2032 build-out of 80-90+ GW), gas combined-cycle and peaking plants…

coal SC/USC, CCGT, peakers, FGD retrofits Supercritical / ultra-supercritical coal (660-800 MW units) Gas combined-cycle (H/J/F-class, 500-1,400 MW) Simple-cycle peakers (frame/aeroderivative CTs, RICE) Emission-control retrofits (wet limestone FGD, SCR, ESP) R&M, life extension and flexibilisation
Capex intensity
1,100 USD/kW
Build time
54 months
Cost overrun
13% mean
Read the brief
Power & digital

Transmission & distribution

The grid build-out that gates every other power and digital asset: EHV AC lines and substations, HVDC corridors (Khavda, Ladakh, SunZia, SuedLink…

HV/EHV lines, substations, HVDC, distribution & smart metering EHV/HV AC transmission lines (220-765 kV) AIS/GIS substations and transformers HVDC links (LCC/VSC, +/-320 to +/-800 kV; subsea and overland) Distribution network and loss reduction Smart meters / AMI (prepaid) and grid digitalisation
Capex intensity
0.6 USD million per km
Build time
30 months
Cost overrun
8% mean
Read the brief
Power & digital

Wind power

Onshore wind (India's 56 GW fleet, US Midwest/Texas, EU repowering) and offshore wind (North Sea, Baltic, US East Coast, Taiwan/Korea, India's first…

onshore, offshore fixed-bottom and floating Onshore wind (3-7 MW turbines) Repowering and life extension Offshore wind, fixed-bottom (monopile/jacket, 12-15 MW) Floating offshore wind Turbine, blade, tower and foundation manufacturing
Capex intensity
1,700 USD/kW
Build time
18 months
Cost overrun
8% mean
Read the brief
Materials, infrastructure & industry

Airports

Greenfield airports, terminal expansions, runways/airside and landside works delivered via PPP concessions (India, EU) or public authorities with…

greenfield, terminal expansion, airside Greenfield airport (runway + terminal + landside) Terminal building / expansion Runways, taxiways & aprons Cargo terminals & MRO Air navigation services & ATC Brownfield airport concession/privatisation
Capex intensity
120 USD per annual passenger of…
Build time
48 months
Cost overrun
14% mean
Read the brief
Materials, infrastructure & industry

Aluminium

Bauxite mining, Bayer alumina refining and Hall-Héroult smelting (13-15 MWh per tonne), plus casthouse and rolling.

smelters, alumina refineries, rolling Primary aluminium smelter Alumina refinery (Bayer process) Bauxite mining Captive power for smelters Rolling, extrusion & recycling
Capex intensity
5,500 USD per tpa aluminium
Build time
42 months
Cost overrun
25% mean
Read the brief
Materials, infrastructure & industry

Automotive manufacturing

Greenfield and brownfield vehicle assembly plants (press, body, paint, general assembly), powertrain/EV battery-pack lines and tier-1 component…

vehicle plants, components, battery packs Passenger-vehicle assembly plant EV battery cell & pack plants Two- and three-wheeler plants Commercial vehicle / bus plants Tier-1 component plants Engine/transmission & e-axle plants
Capex intensity
3,000 USD per unit of annual vehicle…
Build time
26 months
Cost overrun
15% mean
Read the brief
Materials, infrastructure & industry

Cement & aggregates

Clinker production in dry-process rotary kilns with preheater/precalciner, plus grinding units, ready-mix concrete and aggregates.

Integrated cement plant (mine + kiln + grinding) Split grinding unit Ready-mix concrete plants Aggregates quarries CCUS / low-carbon retrofit Waste-heat recovery & captive renewables
Capex intensity
110 USD per tpa cement
Build time
30 months
Cost overrun
15% mean
Read the brief
Materials, infrastructure & industry

Commercial real estate

Development and ownership of Grade-A offices/tech parks, logistics warehouses, retail and mixed-use assets, increasingly held in listed REITs.

offices, warehouses, mixed-use; REITs Grade-A office / IT park Logistics & industrial warehouses Retail malls & high streets Mixed-use & integrated townships REIT / InvIT ownership platforms Government/public redevelopment
Capex intensity
85 USD per sq ft
Build time
36 months
Cost overrun
58% mean
Read the brief
Materials, infrastructure & industry

Iron & steel

Integrated (blast furnace / basic oxygen furnace) and electric (gas- or coal-based DRI, scrap EAF) steelmaking, plus near-zero routes using hydrogen…

BF-BOF, DRI-EAF, green steel Integrated BF-BOF steel plant Gas-based DRI + EAF Coal-based DRI (rotary kiln) + induction/EAF Scrap-based EAF mini-mill Hydrogen DRI green steel Downstream rolling, coating & pipes
Capex intensity
1,000 USD per tpa crude steel
Build time
42 months
Cost overrun
24% mean
Read the brief
Materials, infrastructure & industry

Mining & metals

Open-pit and underground mines with processing (concentrators, heap leach, lithium conversion) and downstream smelting/refining. 2026 features record…

copper, lithium, iron ore, coal; concentrators & smelters Copper mine + concentrator Copper smelter & refinery Lithium (spodumene, brine/DLE, clay) + conversion Iron ore mine + rail + port Opencast coal (India) Zinc/lead mines & smelters
Capex intensity
30,000 USD per annual tonne Cu
Build time
48 months
Cost overrun
27% mean
Read the brief
Materials, infrastructure & industry

Ports, terminals & shipbuilding

Greenfield and brownfield deep-water ports, container/bulk/liquid terminals, transshipment hubs, dredging and hinterland connectivity, plus…

Container terminal (greenfield/brownfield) Greenfield deep-water / offshore port Dry bulk & liquid terminals Transshipment hub Shipbuilding & repair yard Inland waterways & coastal shipping terminals
Capex intensity
600 USD per TEU/yr capacity
Build time
48 months
Cost overrun
30% mean
Read the brief
Materials, infrastructure & industry

Railways & metro

Heavy-rail network expansion, high-speed rail, urban metro/RRTS and dedicated freight corridors, including civil works, track, traction power…

HSR, metro, dedicated freight corridors High-speed rail (≥250 km/h) Metro — elevated Metro — underground Dedicated freight corridors New lines, doubling & gauge conversion Rolling stock manufacturing Signalling & electrification
Capex intensity
45 USD million per route-km
Build time
60 months
Cost overrun
39% mean
Read the brief
Materials, infrastructure & industry

Roads & highways

Design, construction, financing and operation of national highways, expressways, bridges and toll roads under EPC, Hybrid Annuity (HAM), BOT-toll…

expressways, NH, toll roads National highway widening / new alignment (EPC) Hybrid Annuity Model (HAM) BOT-toll / concession roads Access-controlled expressways Major bridges, sea links & tunnels US interstate reconstruction & managed lanes TOT / InvIT asset monetisation
Capex intensity
3.5 USD million per km
Build time
34 months
Cost overrun
15% mean
Read the brief
Materials, infrastructure & industry

Water & wastewater

Bulk water supply, treatment plants, distribution networks, sewage treatment (STPs), water reuse and seawater desalination, delivered via EPC…

supply schemes, STPs, desalination Sewage / wastewater treatment plants Water treatment & bulk supply schemes Seawater reverse-osmosis desalination Distribution networks, metering & NRW reduction Storm/sewer tunnels & storage Water reuse & industrial water/ZLD
Capex intensity
0.25 USD million per MLD
Build time
30 months
Cost overrun
20% mean
Read the brief
Life sciences, consumer & services

Aerospace & defence

Commercial aerostructures and engines, defence platforms (aircraft, missiles, ammunition, naval), precision components (castings, forgings…

manufacturing, MRO, India indigenisation Aerostructures & components Engine parts, castings & forgings Airframe MRO hangars Engine MRO shops Defence platforms (aircraft, helicopters, ships, armoured vehicles) Ammunition, explosives & missiles Defence electronics (radars, EW, avionics, seekers)
Capex intensity
450 USD per sq ft
Build time
24 months
Cost overrun
15% mean
Read the brief
Life sciences, consumer & services

Climate-tech ventures

Venture and growth investments, minority stakes and acquisitions in energy-transition startups (hydrogen & electrolysers, CCUS, biofuels/SAF, battery…

investment portfolio mode Seed & Series A minority stakes Series B/C/growth minority stakes Control acquisition / buyout of a startup JV / project equity in FOAK plant Offtake, venture debt & commercial pilots
Capex intensity
10M USD typical ticket per investment
Build time
36 months
Cost overrun
50% mean
Read the brief
Life sciences, consumer & services

Corporate annual capex portfolio

Generic model of an industrial company's 'regular' annual capital programme: 100-500 small and mid-sized projects across sustaining/maintenance, HSE…

industrial company Sustaining / maintenance capex (stay-in-business) HSE & regulatory / compliance Debottlenecking / brownfield capacity creep Growth / expansion IT / digital / automation Energy efficiency & decarbonisation
Capex intensity
6% of revenue
Build time
9 months
Cost overrun
12% mean
Read the brief
Life sciences, consumer & services

FMCG & food processing

Packaged foods, beverages, dairy, edible oils, personal & home care manufacturing.

Packaged foods (noodles, biscuits, snacks, confectionery) Beverages (CSD, juices, packaged water, dairy drinks) Dairy processing (milk, cheese, powders, ice cream) Edible oil refining & packing Meat, poultry, seafood processing Home & personal care (detergents, soaps, cosmetics) Primary agri processing (rice, flour, pulses, spices)
Capex intensity
700 USD per tonne/yr capacity
Build time
18 months
Cost overrun
10% mean
Read the brief
Life sciences, consumer & services

Healthcare delivery

Multi-specialty and tertiary hospitals, specialty chains (oncology, cardiac, mother & child, eye, dialysis), diagnostics and ambulatory/outpatient…

hospitals & clinical infrastructure Tertiary / quaternary multi-specialty hospital Secondary / tier-2 hospital Specialty chains (oncology, cardiac, eye, IVF, dialysis) Diagnostic labs & imaging Ambulatory surgery / outpatient centres Public / government hospitals & AIIMS
Capex intensity
15M INR per bed
Build time
36 months
Cost overrun
20% mean
Read the brief
Life sciences, consumer & services

Pharmaceuticals & biotech

Covers small-molecule API (bulk drug) plants, oral-solid and sterile formulation plants, biologics drug-substance/drug-product facilities and…

API, formulations, biologics, CDMO, R&D pipeline API / bulk drug & KSM plants Oral solid dose formulations Sterile injectables / fill-finish (vials, PFS, cartridges) Biologics drug substance (mAbs, biosimilars) CDMO / CRDMO (small molecule, biologics, ADC, peptides) Vaccines R&D pipeline (portfolio of clinical assets)
Capex intensity
8,000 USD per litre biologics capacity
Build time
30 months
Cost overrun
15% mean
Read the brief
Life sciences, consumer & services

Warehousing, logistics parks & cold chain

Grade A warehouses, industrial & logistics (I&L) parks, fulfilment centres, temperature-controlled (cold/frozen) storage and reefer distribution.

Grade A dry warehouse / I&L park Automated fulfilment / e-commerce DC Cold / frozen storage warehouse Pharma GDP cold chain (2-8 C, -20 C, ULT) Reefer trucks & containers Agri cold stores & pack-houses (farm-gate)
Capex intensity
30 USD per sq ft
Build time
12 months
Cost overrun
8% mean
Read the brief

Stats on each card are the pack defaults: typical capex intensity in the sector's own unit, construction months and mean cost overrun for the sector. Ranges and sources are in each brief.

How packs feed a decision

From a pack to a committee paper.

The pack is the opening position. Your own estimates, quotes and actuals replace it line by line, and the record shows which numbers are still pack defaults.

  1. 01 · PACK

    Pin the baseline

    The project opens from a pack version. Parameters, swing factors and templates are copied in and pinned, so a later refresh never changes a past decision.

  2. 02 · RANGES

    Ranged estimates

    Parameter ranges and WBS durations seed P50, P80 and P90 for capex, schedule and value instead of a single point.

  3. 03 · SHARED FACTORS

    Correlated swings

    Swing factors and cost lines are wired to shared factors such as copper, steel, rates and power price, so one shock hits every exposed project in the same scenario.

  4. 04 · COMMITTEE

    One envelope

    The ranged options compete for the same capital, routed through your delegation of authority and recorded so the run replays.

Bring us one real decision in your industry.

We start it from the matching pack and pin that version to the record. If your industry is missing, write to hi@capibud.com.

Talk to us →