Industry brief · Power & digital

Wind poweronshore, offshore fixed-bottom and floating

Onshore wind (India's 56 GW fleet, US Midwest/Texas, EU repowering) and offshore wind (North Sea, Baltic, US East Coast, Taiwan/Korea, India's first 1 GW VGF-backed tender). Wind has low historical cost overrun onshore but offshore suffered a 2023-26 crisis of inflation, rates, vessel/cable bottlenecks and US federal stop-work orders, driving cancellations, impairments and a >25% downgrade to offshore forecasts.

10 swing factors · circle size = months of delay0%20%40%60%2.5%5%10%15%20%Probability →Cost impact →Cable, vessel and port bottlenecks: 40% likely, 10% cost impact, 12 monthsAuction design / offtake price inadequacy: 30% likely, 0% cost impact, 12 monthsOEM financial distress: 15% likely, 10% cost impact, 12 monthsFederal/political permit reversal (US offshore stop-work, lease suspension): 35% likely, 15% cost impact, 9 monthsGrid connection and curtailment: 30% likely, 4% cost impact, 9 monthsTurbine quality / serial defects: 25% likely, 6% cost impact, 6 monthsEnvironmental and community opposition (birds, whales, fisheries, land): 25% likely, 3% cost impact, 6 monthsRare-earth magnet supply restrictions: 25% likely, 3% cost impact, 6 monthsCommodity and inflation repricing (steel, copper, resin): 40% likely, 8% cost impact, 0 monthsInterest-rate shock vs fixed CfD/PPA: 35% likely, 10% cost impact, 0 monthsFederal/political permit…Interest-rate shock vs…

Pack v1.0.0 · updated 5 Oct 2026 · 12 cited sources · 13 parameters · 10 swing factors.

At a glance

1,700Capex intensity · USD/kW (onshore blended; offshore ~5,500)range 730–7,100 · sourced
18Construction time · months (onshore; offshore 24-36)range 12–40 · sourced
8%Mean cost overrun (onshore; offshore 2021-25 vintage ~0.2-0.4)range 0%–40% · sourced
20%Mean schedule overrunrange 0%–80% · sourced

Pack defaults with their low–high range. Overruns are sector means as a share of the original budget or schedule. All parameters and sources

Sub-industries

Capex intensity ranges by configuration. The unit changes with the asset, so compare within a row, not across rows.

Sub-industryCapex intensityNotes
Onshore wind (3-7 MW turbines)Utility-scale onshore wind and wind-solar hybrids; India (Gujarat, Tamil Nadu, Karnataka), US (TX, OK, IA, WY), EU (DE, ES, Nordics).730–2,750USD per kWIndia ~Rs 7-8 crore/MW (~USD 730-835/kW) - estimate; Lazard 2026 US USD 1,900-2,750/kW; EIA AEO2026 USD 1,712/kW.
Repowering and life extensionReplacing sub-2 MW legacy turbines with modern 3-5 MW machines on the best sites; India repowering potential ~25.4 GW.600–1,600USD per kWestimate; reuses grid connection and land, but decommissioning and PPA re-contracting add complexity.
Offshore wind, fixed-bottom (monopile/jacket, 12-15 MW)North Sea, Baltic, US Northeast, Taiwan; includes offshore substations and export cables (often TSO-built in DE/NL).3,700–7,100USD per kWLazard 2026 USD 5,600-7,100/kW; EIA AEO2026 USD 3,711/kW (900 MW). India VGF: Rs 7,453 crore for first 1 GW (Gujarat/Tamil Nadu).
Floating offshore windSemi-sub/spar foundations for deep water (Scotland, France, Norway, Korea, US West Coast); pre-commercial.6,000–10,000USD per kWestimate; arrays of 30-500 MW with high FOAK premia.
Turbine, blade, tower and foundation manufacturingNacelle assembly, blades, towers, monopiles, cables; India is an export hub (Suzlon, Siemens Gamesa, Vestas, Envision, Inox).30–400USD million per GW/yrestimate: nacelle/blade plants USD 30-80m per GW/yr; monopile/cable factories USD 200-400m per GW/yr-equivalent.

Value chain

Inputs

  • steel plate (towers, monopiles)
  • copper and aluminium (generators, array/export cables)
  • rare-earth permanent magnets (NdFeB)
  • glass/carbon fibre and epoxy resin (blades)
  • castings and forgings (hubs, mainshafts)
  • installation vessels and heavy-lift cranes
  • port infrastructure
  • seabed leases / land and wind data

Process

  • wind resource campaign and micro-siting
  • permitting and environmental studies (birds, marine mammals)
  • turbine supply agreement
  • foundation and tower installation
  • nacelle/blade installation
  • array and export cables, onshore/offshore substations
  • commissioning and grid code tests
  • O&M (CTVs/SOVs), major component exchange

Outputs

  • variable renewable electricity (higher evening/winter output than solar)
  • RECs/GOs
  • hybrid RTC power with solar+BESS
  • turbine and component exports

Parameters

13 parameters: 8 sourced, 5 informed estimates. The bar shows the low–high range with the default marked; estimates are labelled and never presented as observed data.

ParameterDefault & rangeEvidenceSource
Capex intensity(onshore blended; offshore ~5,500)1,700 USD/kWrange 730–7,100sourcedas of 5 Oct 2026lazard.com eia.gov
Construction months(onshore; offshore 24-36)18 monthsrange 12–40sourcedas of 5 Oct 2026lazard.com
Cost overrun mean(onshore; offshore 2021-25 vintage ~0.2-0.4)8%range 0%–40%sourcedas of 5 Oct 2026doi.org
Schedule overrun mean20%range 0%–80%sourcedas of 5 Oct 2026en.wikipedia.org
Asset life (years)30 yearsrange 25–35sourcedas of 5 Oct 2026lazard.com
WACC7.5%range 5.5%–10%estimateas of 5 Oct 2026onshore 6-8%, offshore 7-9.5% post-2023
Typical IRR(equity)11%range 8%–15%estimateas of 5 Oct 2026Orsted targets 150-200 bp spread over WACC
Utilization(capacity factor)35%range 25%–55%sourcedas of 5 Oct 2026lazard.com
Opex % of revenue22%range 15%–35%estimateas of 5 Oct 2026fixed O&M USD 24.5-40/kW-yr onshore, 60-91.5 offshore per Lazard
EBITDA margin(IPP); OEMs 0-10%75%range 60%–85%estimateas of 5 Oct 2026Informed estimate; no single source
LCOE (USD per MWh onshore)68 USD/MWhrange 37–99sourcedas of 5 Oct 2026lazard.com
LCOE (USD per MWh offshore)136 USD/MWhrange 105–167sourcedas of 5 Oct 2026lazard.com
Turbine rating MW(onshore); offshore 12-155 MWrange 3–15estimateas of 5 Oct 2026Informed estimate; no single source

What moves value

Sorted by expected cost (probability × cost impact). Impacts are typical values for the sector; each one is driven by the shared factors listed, which is how one shock reaches several projects at once.

Swing factorProbabilityCost impactSchedule
Federal/political permit reversal (US offshore stop-work, lease suspension)Regulatory Shared factors: Policy 1Watch: BOEM/Interior orders; court injunction rulings; OBBBA begin-construction guidance
35%
15%
9 mo
Cable, vessel and port bottlenecksSupply chain Shared factors: Copper 0.4 · Electrical equipment 0.3 · Labour 0.2 · Oil 0.1Watch: HV cable order backlog; WTIV day rates; port availability
40%
10%
12 mo
Interest-rate shock vs fixed CfD/PPAFinancing Shared factors: Interest rates 1Watch: US 10Y/Bund; CfD indexation terms; bank margins for offshore
35%
10%
0 mo
Commodity and inflation repricing (steel, copper, resin)Commodity Shared factors: Steel 0.5 · Copper 0.4 · Oil 0.1Watch: steel PPI; copper price; OEM price escalation clauses
40%
8%
0 mo
OEM financial distressInterface Shared factors: Policy 0.4 · Interest rates 0.3 · Steel 0.3Watch: OEM margins and guarantees; supplier Ch.11 (TPI 2025); parent-company guarantees
15%
10%
12 mo
Turbine quality / serial defectsTechnical Shared factors: Electrical equipment 0.5 · Labour 0.3 · Steel 0.2Watch: OEM warranty provisions; blade/gearbox/bearing failure rates; OEM platform recalls
25%
6%
6 mo
Grid connection and curtailmentInterface Shared factors: Grid queue 0.8 · Electrical equipment 0.2Watch: TSO offshore grid delays (TenneT); ISTS substation readiness; redispatch volumes
30%
4%
9 mo
Environmental and community opposition (birds, whales, fisheries, land)ESG Shared factors: Policy 0.8 · Labour 0.2Watch: GIB court rulings (India); NOAA consultations; local zoning moratoria
25%
3%
6 mo
Rare-earth magnet supply restrictionsGeopolitical Shared factors: Policy 0.8 · Electrical equipment 0.2Watch: China export licensing for NdFeB/REEs; magnet price indices
25%
3%
6 mo
Auction design / offtake price inadequacyMarket Shared factors: Policy 0.6 · Power price 0.4Watch: undersubscribed auctions (DE Aug-2025 zero bids); administrative strike price vs LCOE
30%
0%
12 mo

Market signals

What moves the case

Key variables with their typical range and what they hit in the model.

VariableTypical rangeAffects
Turbine price (ex-works)Chinese turbines ~USD 300-400/kW vs Western ~USD 900-1,300/kW; Chinese prices down ~50% since 2022 while European prices rose.300–1,300USD/kWCapex
Steel mill products PPITowers/monopiles: ~120-180 t steel/MW onshore, 250-400 t/MW offshore incl. foundations; +23% y/y.180–420indexCapex
CopperOffshore export cables are copper-intensive (~8-15 t/MW incl. arrays); +39% y/y Jul-2026.7,000–14,000USD/tCapex
Power wire and cable PPIHV subsea cable slots (Prysmian, NKT, Nexans) booked to ~2028-30.250–600indexCapex
Net capacity factorIndia onshore 28-36%, US onshore 30-55% (Lazard), offshore 45-55%.25%–55%Revenue
PPA / CfD strike priceIndia wind auctions ~Rs 3.2-3.8/kWh; UK/EU offshore CfDs re-set higher after 2023 failed rounds.35–160USD/MWhRevenue
US 10-year TreasuryOffshore wind most rate-sensitive renewable: +100 bp ~ +10% LCOE.3–6percentFinancing
German 10-year BundBenchmark for EU offshore CfD/merchant financing.0–4percentFinancing
Show 3 more variables
VariableTypical rangeAffects
USD per EUREuropean turbines/cables priced in EUR/DKK for US and Indian offshore projects.0.95–1.25USD/EURCapex
European gas (sets marginal power price)Merchant tail and capture prices for EU wind move with gas-fired marginal cost.6–50USD/MMBtuRevenue
Curtailment / grid unavailabilityGerman redispatch, Scottish constraint payments, Tamil Nadu evacuation limits.0%–12%Revenue

Price feeds (12)

SeriesSource / idUnitFrequency
PPI: Steel mill productsWPU1017FREDindexmonthly
PPI: Fabricated structural metalPCU332312332312FREDindexmonthly
Global price of CopperPCOPPUSDMFREDUSD/tmonthly
COMEX copper futuresHG=FYahooUSD/lbdaily
PPI: Power wire and cable (nonferrous)PCU3359293359291FREDindexmonthly
PPI: Turbines and turbine generator setsPCU333611333611FREDindexmonthly
PPI: Plastics material and resin (blade epoxy proxy)PCU325211325211FREDindexmonthly
Global price of Natural Gas, EUPNGASEUUSDMFREDUSD/MMBtumonthly
Show 4 more feeds
SeriesSource / idUnitFrequency
US 10-year Treasury yieldDGS10FREDpercentdaily
Germany 10-year Bund yieldIRLTLT01DEM156NFREDpercentmonthly
USD per EURDEXUSEUFREDUSD/EURdaily
First Trust Global Wind Energy ETFFANYahooUSDdaily

Listed tickers (22)

Market context only: these prices tend to react first when a driver moves. Named for context; no affiliation.

Operators · 11

  • ADANIGREEN.NS Adani Green Energy NSE · IN
  • JSWENERGY.NS JSW Energy NSE · IN
  • KPIGREEN.NS KPI Green Energy NSE · IN
  • NTPCGREEN.NS NTPC Green Energy NSE · IN
  • NEE NextEra Energy NYSE · US
  • AES AES Corp NYSE · US
  • ORSTED.CO Orsted Nasdaq Copenhagen · EU
  • RWE.DE RWE XETRA · EU
  • IBE.MC Iberdrola BME · EU
  • EDPR.LS EDP Renovaveis Euronext Lisbon · EU
  • SSE.L SSE plc LSE · EU

Suppliers · 10

  • SUZLON.NS Suzlon Energy NSE · IN
  • INOXWIND.NS Inox Wind NSE · IN
  • INOXGREEN.NS Inox Green Energy Services NSE · IN
  • GEV GE Vernova NYSE · US
  • VWS.CO Vestas Wind Systems Nasdaq Copenhagen · EU
  • ENR.DE Siemens Energy (Siemens Gamesa) XETRA · EU
  • NDX1.DE Nordex XETRA · EU
  • PRY.MI Prysmian Borsa Italiana · EU
  • NKT.CO NKT Nasdaq Copenhagen · EU
  • 112610.KS CS Wind KRX · APAC

Proxys · 1

  • FAN First Trust Global Wind Energy ETF NYSE Arca · US

KPIs, regions and who builds

KPIs the pack tracks

  • Capex per MW (Rs crore/MW, USD/kW)
  • Net capacity factor / PLF (%)
  • Turbine availability (%)
  • Curtailment (%)
  • LCOE (USD/MWh)
  • PPA/CfD tariff
  • Turbines installed per vessel-day (offshore)
  • Months from FID to COD
  • OEM order backlog (GW)
  • Warranty cost (% of revenue)
  • Lost production factor (%)

Regional notes

India56 GW onshore (Mar-2026) concentrated in Gujarat, Tamil Nadu, Karnataka, Maharashtra, Rajasthan; strong domestic OEM base (Suzlon, Inox, Envision, Vestas, SGRE) and ALMM-type list for wind (RLMM); hybrid/FDRE tenders favour wind; offshore starts with 1 GW VGF (Rs 7,453 crore) but 30 GW-by-2030 ambition is unrealistic.
United StatesOBBBA ends 45Y/48E for wind unless construction begins by Jul-2026 or service by end-2027; offshore faces federal hostility (stop-work orders, lease suspensions, permit reviews) though courts have restored work; onshore repowering within safe-harbour remains active.
EuropeWind Power Package and NZIA; Germany targets 30 GW offshore by 2030 but Aug-2025 offshore auction received zero bids, prompting redesign toward CfDs; UK CfD AR6/AR7 re-set strike prices; North Sea grid cooperation.
Middle EastSaudi (Dumat Al Jandal), Egypt (Gulf of Suez) and Oman onshore wind at low tariffs with Chinese turbines.

Who builds and operates

Named for context; no affiliation. These are public market participants drawn from the research behind the pack. They are not Capibud clients or partners.

Operators · 12

  • Adani Green Energy Ahmedabad · INWind-solar hybrids at Khavda; in-house 5.2 MW turbine manufacturing.
  • JSW Neo Energy Mumbai · INMulti-GW wind pipeline; own turbine manufacturing JV.
  • ReNew / Greenko / Serentica / Juniper Various · INWind-heavy RTC/FDRE hybrid portfolios for C&I and discoms.
  • NTPC Green / NHPC / SJVN New Delhi · INPSU developers and REIAs tendering wind/hybrid capacity.
  • NextEra Energy Resources Juno Beach · USLargest US wind owner; repowering and new builds within OBBBA safe-harbour window.
  • Invenergy / Pattern / Avangrid Chicago / San Francisco / Orange CT · USSunZia (3.5 GW wind + HVDC) and other large onshore programmes.
  • Dominion Energy Richmond · USCoastal Virginia Offshore Wind 2.6 GW (~USD 10.9bn) - regulated offshore.
  • Orsted Fredericia · EUGlobal offshore leader; Revolution/Sunrise Wind hit by 2025 US stop-work orders; Hornsea 4 cancelled May-2025; large 2025 rights issue and asset sales (50% Hornsea 3 to Apollo).
  • RWE Essen · EUMajor offshore developer (Sofia, Thor, Nordseecluster); paused US offshore.
  • Iberdrola / EDPR / Vattenfall / SSE Bilbao / Madrid / Stockholm / Perth · EUEast Anglia, Dogger Bank (SSE/Equinor), Baltic projects.
  • Equinor Stavanger · EUEmpire Wind 1 (COD ~2027) after 2025 stop-work and Dec-2025 lease suspension overturned Jan-2026.
  • ACWA Power / Masdar Riyadh / Abu Dhabi · MESaudi/Egypt/Uzbek GW-scale onshore wind with Chinese OEMs.

Suppliers · 12

  • Suzlon Energy OEM · INLargest Indian OEM (S144 3.15 MW platform), ~5+ GW order book, debt-free turnaround.
  • Inox Wind OEM · IN3.3 MW platform; EPC + O&M via Inox Green.
  • Vestas OEM · EUMarket leader outside China; V236-15 MW offshore; Indian factories in Chennai.
  • Siemens Gamesa (Siemens Energy) OEM · EUOffshore leader; onshore 4.X/5.X quality issues caused multi-billion losses 2023-25.
  • GE Vernova Wind OEM · USLeading US onshore OEM; Haliade-X offshore troubles (Vineyard Wind blade failure 2024).
  • Nordex OEM · EUOnshore N163/N175 for Europe; returned to profitability 2024-25.
  • Envision / Goldwind / Mingyang / Windey OEM · APACChinese OEMs with ~50% lower turbine prices; Envision manufacturing in India.
  • Prysmian / NKT / Nexans / LS Cable OEM · EUHV/HVDC export cables; capacity booked to ~2028-30.
  • Sif / EEW / Bladt / CS Wind Materials · EUMonopiles, transition pieces and towers.
  • Cadeler / DEME / Jan De Nul / Van Oord Services · EUWind turbine installation vessels and foundation installation; vessel scarcity.
  • LM Wind Power / TPI Composites Materials · EUBlades; TPI filed for Chapter 11 in 2025 highlighting supply-chain fragility.
  • Senvion India / KP Energy / Inox Green EPC · INBalance-of-plant EPC and O&M for Indian wind farms.

Customers · 6

  • Indian discoms via SECI/NTPC/NHPC hybrid and FDRE tenders regulated PPAWind valued for evening output in RTC structures.
  • C&I green open access buyers corporate PPAGujarat/Tamil Nadu/Karnataka wind for group-captive.
  • Hyperscalers and tech companies corporate PPAAmazon, Microsoft, Google are top buyers of EU offshore/onshore PPAs.
  • UK/EU governments via CfD CfDUK AR6/AR7 and EU two-sided CfDs.
  • US Northeast states (NY, NJ, MA, VA) OREC procurementState offshore wind solicitations; several contracts cancelled/rebid 2023-25.
  • Green hydrogen producers captive REWind-solar hybrid for electrolysers (India SIGHT, Oman, NEOM).

Project template

Work breakdown

Share of total duration per step; steps overlap where predecessors allow, as the bars show. O / ML / P are optimistic, most-likely and pessimistic multipliers on each step's duration; the hatched tail is the pessimistic case.

IDStep & timingShareO / ML / P
A100Wind measurement campaign (12-24 months met-mast/LiDAR) and site controlDevelop · factors: Policy30%0.9 / 1 / 1.4
A110Environmental/ecological studies and permits (incl. seabed lease, COP for offshore)Develop · factors: Policy30%0.85 / 1 / 2
A120Grid connection agreement / interconnectionDevelop · factors: Grid queue25%0.85 / 1 / 1.8
A130Offtake (PPA/CfD/auction) and financial closeDevelop · factors: Interest rates, Power price, Policy12%0.9 / 1 / 1.8
B100Micro-siting, foundation/geotech design, electrical designEngineer · EPC · factors: Labour12%0.9 / 1 / 1.3
C100Turbine supply agreement and manufacturing slotsProcure · OEM · factors: Electrical equipment, Steel, Copper25%0.9 / 1 / 1.5
C110Foundations/towers/monopiles and cables (array/export)Procure · OEM · factors: Steel, Copper, Electrical equipment30%0.9 / 1 / 1.6
C120Substation transformers and installation vessels/cranesProcure · OEM · factors: Electrical equipment, Oil, Labour25%0.9 / 1 / 1.6
D100Civil works: roads, crane pads, foundations (onshore) / monopile installation (offshore)Construct · EPC · factors: Construction materials, Steel, Labour25%0.9 / 1 / 1.5
D110Turbine erection (tower, nacelle, blades)Construct · OEM · factors: Labour, Oil, Electrical equipment20%0.9 / 1 / 1.6
D120Array cabling, substations and export lineConstruct · EPC · factors: Copper, Electrical equipment, Labour20%0.9 / 1 / 1.6
E100Commissioning, grid-code tests, reliability run and CODCommission · OEM · factors: Grid queue, Electrical equipment8%0.9 / 1 / 1.6

Cost breakdown

Share of capex by line, with the commodity exposure of each line (the share of that line that moves with the commodity).

  • Turbines (nacelle, blades, hub)40%
    Equipment
    • Electrical equipment 40%
    • Steel 30%
    • Copper 15%
    • Policy 15%
  • Towers and foundations16%
    Equipment
    • Steel 70%
    • Construction materials 30%
  • Electrical BOS: cables, substations, transformers14%
    Equipment
    • Electrical equipment 50%
    • Copper 40%
    • Aluminium 10%
  • Installation, logistics and civil works13%
    Construction
    • Labour 50%
    • Construction materials 30%
    • Oil 20%
  • Development, land/seabed lease, permits6%
    Develop
    • Policy 70%
    • Grid queue 30%
  • Financing, insurance, IDC and contingency6%
    Indirects
    • Interest rates 100%
  • Engineering and project management4%
    Engineering
    • Labour 80%
  • Commissioning and spares1%
    Commissioning

Financial template

Revenue model

Long-term PPAs (India SECI/state hybrid tenders, US utility/corporate), two-sided CfDs and ORECs for offshore, merchant capture-price tail plus RECs/GOs; OEMs earn turbine sale margins and long-term service agreements.

Margin driver

Net capacity factor

Ramp-up

1 year to steady state

How Capibud uses this pack

A pack is a starting position, not a forecast. When a wind power decision opens in Capibud, pack v1.0.0 is copied in and pinned to that decision. The 13 parameters, 10 swing factors and templates the committee saw stay attached to the decision record, even after the pack is next refreshed.

Parameter ranges and WBS durations seed the P50, P80 and P90 for capex, schedule and value. Your own estimates, vendor quotes and actuals replace pack defaults line by line, and the record shows which numbers are still defaults.

Each swing factor is wired to shared factors; here the heaviest are policy, electrical equipment, copper and interest rates. A move in one factor hits every exposed project in the same scenario, which is how the capital committee sees concentration across a book rather than project by project.

The 12 price feeds and 22 listed tickers feed the brain, which watches for drivers moving outside their pack range and drafts the change for a person to review.

Shared factors behind this pack's swing factors

  • Policy
  • Electrical equipment
  • Copper
  • Interest rates
  • Steel
  • Grid queue
  • Labour
Relative weight: probability × impact × driver weight, summed over swing factors.

Capex tied to a shared factor

  • Steel23.2%
  • Electrical equipment23%
  • Copper11.6%
  • Policy10.2%
  • Labour9.7%
  • Construction materials8.7%
  • Interest rates6%
Share of total capex, from the cost breakdown and its commodity exposures.

Sources

Every link opens the original source in a new tab. Values marked as estimates are informed estimates by the Capibud research team.

  1. iea.orghttps://www.iea.org/reports/renewables-2025/executive-summary
  2. lazard.comhttps://www.lazard.com/media/kcfconhf/lazards-lcoeplus_vf.pdf
  3. eia.govhttps://www.eia.gov/outlooks/aeo/assumptions/pdf/EMM_Assumptions.pdf
  4. doi.orghttps://doi.org/10.1016/j.erss.2014.07.016
  5. en.wikipedia.orghttps://en.wikipedia.org/wiki/Wind_power_in_India
  6. en.wikipedia.orghttps://en.wikipedia.org/wiki/Revolution_Wind
  7. en.wikipedia.orghttps://en.wikipedia.org/wiki/Empire_Wind
  8. en.wikipedia.orghttps://en.wikipedia.org/wiki/Hornsea_Wind_Farm
  9. en.wikipedia.orghttps://en.wikipedia.org/wiki/Offshore_wind_power
  10. en.wikipedia.orghttps://en.wikipedia.org/wiki/One_Big_Beautiful_Bill_Act
  11. fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PCU3359293359291
  12. mnre.gov.inhttps://mnre.gov.in/

Bring us one real decision in wind power.

We start it from the Wind power pack v1.0.0: 13 parameters, 10 swing factors and the 12-step project template, pinned to your decision.

Talk to us →