Industry brief · Power & digital
Wind poweronshore, offshore fixed-bottom and floating
Onshore wind (India's 56 GW fleet, US Midwest/Texas, EU repowering) and offshore wind (North Sea, Baltic, US East Coast, Taiwan/Korea, India's first 1 GW VGF-backed tender). Wind has low historical cost overrun onshore but offshore suffered a 2023-26 crisis of inflation, rates, vessel/cable bottlenecks and US federal stop-work orders, driving cancellations, impairments and a >25% downgrade to offshore forecasts.
Pack v1.0.0 · updated 5 Oct 2026 · 12 cited sources · 13 parameters · 10 swing factors.
At a glance
Pack defaults with their low–high range. Overruns are sector means as a share of the original budget or schedule. All parameters and sources
Sub-industries
Capex intensity ranges by configuration. The unit changes with the asset, so compare within a row, not across rows.
| Sub-industry | Capex intensity | Notes |
|---|---|---|
| Onshore wind (3-7 MW turbines)Utility-scale onshore wind and wind-solar hybrids; India (Gujarat, Tamil Nadu, Karnataka), US (TX, OK, IA, WY), EU (DE, ES, Nordics). | 730–2,750USD per kW | India ~Rs 7-8 crore/MW (~USD 730-835/kW) - estimate; Lazard 2026 US USD 1,900-2,750/kW; EIA AEO2026 USD 1,712/kW. |
| Repowering and life extensionReplacing sub-2 MW legacy turbines with modern 3-5 MW machines on the best sites; India repowering potential ~25.4 GW. | 600–1,600USD per kW | estimate; reuses grid connection and land, but decommissioning and PPA re-contracting add complexity. |
| Offshore wind, fixed-bottom (monopile/jacket, 12-15 MW)North Sea, Baltic, US Northeast, Taiwan; includes offshore substations and export cables (often TSO-built in DE/NL). | 3,700–7,100USD per kW | Lazard 2026 USD 5,600-7,100/kW; EIA AEO2026 USD 3,711/kW (900 MW). India VGF: Rs 7,453 crore for first 1 GW (Gujarat/Tamil Nadu). |
| Floating offshore windSemi-sub/spar foundations for deep water (Scotland, France, Norway, Korea, US West Coast); pre-commercial. | 6,000–10,000USD per kW | estimate; arrays of 30-500 MW with high FOAK premia. |
| Turbine, blade, tower and foundation manufacturingNacelle assembly, blades, towers, monopiles, cables; India is an export hub (Suzlon, Siemens Gamesa, Vestas, Envision, Inox). | 30–400USD million per GW/yr | estimate: nacelle/blade plants USD 30-80m per GW/yr; monopile/cable factories USD 200-400m per GW/yr-equivalent. |
Value chain
Inputs
- steel plate (towers, monopiles)
- copper and aluminium (generators, array/export cables)
- rare-earth permanent magnets (NdFeB)
- glass/carbon fibre and epoxy resin (blades)
- castings and forgings (hubs, mainshafts)
- installation vessels and heavy-lift cranes
- port infrastructure
- seabed leases / land and wind data
Process
- wind resource campaign and micro-siting
- permitting and environmental studies (birds, marine mammals)
- turbine supply agreement
- foundation and tower installation
- nacelle/blade installation
- array and export cables, onshore/offshore substations
- commissioning and grid code tests
- O&M (CTVs/SOVs), major component exchange
Outputs
- variable renewable electricity (higher evening/winter output than solar)
- RECs/GOs
- hybrid RTC power with solar+BESS
- turbine and component exports
Parameters
13 parameters: 8 sourced, 5 informed estimates. The bar shows the low–high range with the default marked; estimates are labelled and never presented as observed data.
| Parameter | Default & range | Evidence | Source |
|---|---|---|---|
| Capex intensity(onshore blended; offshore ~5,500) | 1,700 USD/kWrange 730–7,100 | sourcedas of 5 Oct 2026 | lazard.com eia.gov |
| Construction months(onshore; offshore 24-36) | 18 monthsrange 12–40 | sourcedas of 5 Oct 2026 | lazard.com |
| Cost overrun mean(onshore; offshore 2021-25 vintage ~0.2-0.4) | 8%range 0%–40% | sourcedas of 5 Oct 2026 | doi.org |
| Schedule overrun mean | 20%range 0%–80% | sourcedas of 5 Oct 2026 | en.wikipedia.org |
| Asset life (years) | 30 yearsrange 25–35 | sourcedas of 5 Oct 2026 | lazard.com |
| WACC | 7.5%range 5.5%–10% | estimateas of 5 Oct 2026 | onshore 6-8%, offshore 7-9.5% post-2023 |
| Typical IRR(equity) | 11%range 8%–15% | estimateas of 5 Oct 2026 | Orsted targets 150-200 bp spread over WACC |
| Utilization(capacity factor) | 35%range 25%–55% | sourcedas of 5 Oct 2026 | lazard.com |
| Opex % of revenue | 22%range 15%–35% | estimateas of 5 Oct 2026 | fixed O&M USD 24.5-40/kW-yr onshore, 60-91.5 offshore per Lazard |
| EBITDA margin(IPP); OEMs 0-10% | 75%range 60%–85% | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| LCOE (USD per MWh onshore) | 68 USD/MWhrange 37–99 | sourcedas of 5 Oct 2026 | lazard.com |
| LCOE (USD per MWh offshore) | 136 USD/MWhrange 105–167 | sourcedas of 5 Oct 2026 | lazard.com |
| Turbine rating MW(onshore); offshore 12-15 | 5 MWrange 3–15 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
What moves value
Sorted by expected cost (probability × cost impact). Impacts are typical values for the sector; each one is driven by the shared factors listed, which is how one shock reaches several projects at once.
Market signals
What moves the case
Key variables with their typical range and what they hit in the model.
| Variable | Typical range | Affects |
|---|---|---|
| Turbine price (ex-works)Chinese turbines ~USD 300-400/kW vs Western ~USD 900-1,300/kW; Chinese prices down ~50% since 2022 while European prices rose. | 300–1,300USD/kW | Capex |
| Steel mill products PPITowers/monopiles: ~120-180 t steel/MW onshore, 250-400 t/MW offshore incl. foundations; +23% y/y. | 180–420index | Capex |
| CopperOffshore export cables are copper-intensive (~8-15 t/MW incl. arrays); +39% y/y Jul-2026. | 7,000–14,000USD/t | Capex |
| Power wire and cable PPIHV subsea cable slots (Prysmian, NKT, Nexans) booked to ~2028-30. | 250–600index | Capex |
| Net capacity factorIndia onshore 28-36%, US onshore 30-55% (Lazard), offshore 45-55%. | 25%–55% | Revenue |
| PPA / CfD strike priceIndia wind auctions ~Rs 3.2-3.8/kWh; UK/EU offshore CfDs re-set higher after 2023 failed rounds. | 35–160USD/MWh | Revenue |
| US 10-year TreasuryOffshore wind most rate-sensitive renewable: +100 bp ~ +10% LCOE. | 3–6percent | Financing |
| German 10-year BundBenchmark for EU offshore CfD/merchant financing. | 0–4percent | Financing |
Show 3 more variables
| Variable | Typical range | Affects |
|---|---|---|
| USD per EUREuropean turbines/cables priced in EUR/DKK for US and Indian offshore projects. | 0.95–1.25USD/EUR | Capex |
| European gas (sets marginal power price)Merchant tail and capture prices for EU wind move with gas-fired marginal cost. | 6–50USD/MMBtu | Revenue |
| Curtailment / grid unavailabilityGerman redispatch, Scottish constraint payments, Tamil Nadu evacuation limits. | 0%–12% | Revenue |
Price feeds (12)
| Series | Source / id | Unit | Frequency |
|---|---|---|---|
| PPI: Steel mill products | WPU1017FRED | index | monthly |
| PPI: Fabricated structural metal | PCU332312332312FRED | index | monthly |
| Global price of Copper | PCOPPUSDMFRED | USD/t | monthly |
| COMEX copper futures | HG=FYahoo | USD/lb | daily |
| PPI: Power wire and cable (nonferrous) | PCU3359293359291FRED | index | monthly |
| PPI: Turbines and turbine generator sets | PCU333611333611FRED | index | monthly |
| PPI: Plastics material and resin (blade epoxy proxy) | PCU325211325211FRED | index | monthly |
| Global price of Natural Gas, EU | PNGASEUUSDMFRED | USD/MMBtu | monthly |
Show 4 more feeds
| Series | Source / id | Unit | Frequency |
|---|---|---|---|
| US 10-year Treasury yield | DGS10FRED | percent | daily |
| Germany 10-year Bund yield | IRLTLT01DEM156NFRED | percent | monthly |
| USD per EUR | DEXUSEUFRED | USD/EUR | daily |
| First Trust Global Wind Energy ETF | FANYahoo | USD | daily |
Listed tickers (22)
Market context only: these prices tend to react first when a driver moves. Named for context; no affiliation.
Operators · 11
- ADANIGREEN.NS Adani Green Energy NSE · IN
- JSWENERGY.NS JSW Energy NSE · IN
- KPIGREEN.NS KPI Green Energy NSE · IN
- NTPCGREEN.NS NTPC Green Energy NSE · IN
- NEE NextEra Energy NYSE · US
- AES AES Corp NYSE · US
- ORSTED.CO Orsted Nasdaq Copenhagen · EU
- RWE.DE RWE XETRA · EU
- IBE.MC Iberdrola BME · EU
- EDPR.LS EDP Renovaveis Euronext Lisbon · EU
- SSE.L SSE plc LSE · EU
Suppliers · 10
- SUZLON.NS Suzlon Energy NSE · IN
- INOXWIND.NS Inox Wind NSE · IN
- INOXGREEN.NS Inox Green Energy Services NSE · IN
- GEV GE Vernova NYSE · US
- VWS.CO Vestas Wind Systems Nasdaq Copenhagen · EU
- ENR.DE Siemens Energy (Siemens Gamesa) XETRA · EU
- NDX1.DE Nordex XETRA · EU
- PRY.MI Prysmian Borsa Italiana · EU
- NKT.CO NKT Nasdaq Copenhagen · EU
- 112610.KS CS Wind KRX · APAC
Proxys · 1
- FAN First Trust Global Wind Energy ETF NYSE Arca · US
Trends and research findings
Trends
- Offshore downgrade2025-2030
Offshore wind growth forecast revised down by more than 25%; global wind still nearly doubles to >2,000 GW by 2030 led by China/EU onshore.
- US offshore under federal pressure2025-2029
BOEM stop-work order on Revolution Wind (Aug-2025) and Interior suspension of five leases (Dec-2025) - both overturned in court; Empire Wind slipped to 2027.
- European developer retrenchment2025-2027
Orsted cancelled Hornsea 4 (2.4 GW) in May-2025 and sold 50% of Hornsea 3 to Apollo for USD 6.1bn (Dec-2025).
- India onshore revival and offshore start2025-2032
Installed wind reached 56 GW (Mar-2026); repowering potential ~25.4 GW; VGF scheme (Jun-2024) supports the first 1 GW offshore off Gujarat and Tamil Nadu.
- Western OEM margin pressure vs Chinese price gap2024-2028
Western wind manufacturers reported cumulative losses of USD 1.2bn; Chinese turbine prices down ~50% since 2022 while European prices rose.
- North Sea grid integration2026-2040
UK joining the European plan for a ~100 GW North Sea offshore grid (2026) via hybrid interconnectors.
Research findings
- Lazard LCOE+ 2026 wind
Onshore capex USD 1,900-2,750/kW, LCOE USD 37-99/MWh; offshore capex USD 5,600-7,100/kW, LCOE USD 105-167/MWh (USD 77-150 with PTC).
- EIA AEO2026
Onshore wind USD 1,712/kW (3-yr lead), offshore USD 3,711/kW (4-yr lead) with fixed O&M USD 161/kW-yr offshore.
- Overrun record
Wind projects averaged ~7.7% cost overrun in a 401-project sample - low vs hydro/nuclear.
- Rare earth dependence
China dominates REE mining (60%) and refining (90%), and ~90% of magnet production used in large turbines.
- Cable and steel inflation
US power wire & cable PPI +116% and steel mill products +104% vs Jan-2020 (Aug-2026).
- India tariff drift
Wind auction tariffs rose from a record-low Rs 2.43/kWh (Dec-2017) to ~Rs 3.17/kWh (May-2023) as CUF-adjusted capex increased.
KPIs, regions and who builds
KPIs the pack tracks
Regional notes
| India | 56 GW onshore (Mar-2026) concentrated in Gujarat, Tamil Nadu, Karnataka, Maharashtra, Rajasthan; strong domestic OEM base (Suzlon, Inox, Envision, Vestas, SGRE) and ALMM-type list for wind (RLMM); hybrid/FDRE tenders favour wind; offshore starts with 1 GW VGF (Rs 7,453 crore) but 30 GW-by-2030 ambition is unrealistic. |
|---|---|
| United States | OBBBA ends 45Y/48E for wind unless construction begins by Jul-2026 or service by end-2027; offshore faces federal hostility (stop-work orders, lease suspensions, permit reviews) though courts have restored work; onshore repowering within safe-harbour remains active. |
| Europe | Wind Power Package and NZIA; Germany targets 30 GW offshore by 2030 but Aug-2025 offshore auction received zero bids, prompting redesign toward CfDs; UK CfD AR6/AR7 re-set strike prices; North Sea grid cooperation. |
| Middle East | Saudi (Dumat Al Jandal), Egypt (Gulf of Suez) and Oman onshore wind at low tariffs with Chinese turbines. |
Who builds and operates
Named for context; no affiliation. These are public market participants drawn from the research behind the pack. They are not Capibud clients or partners.
Operators · 12
- Adani Green Energy Wind-solar hybrids at Khavda; in-house 5.2 MW turbine manufacturing.
- JSW Neo Energy Multi-GW wind pipeline; own turbine manufacturing JV.
- ReNew / Greenko / Serentica / Juniper Wind-heavy RTC/FDRE hybrid portfolios for C&I and discoms.
- NTPC Green / NHPC / SJVN PSU developers and REIAs tendering wind/hybrid capacity.
- NextEra Energy Resources Largest US wind owner; repowering and new builds within OBBBA safe-harbour window.
- Invenergy / Pattern / Avangrid SunZia (3.5 GW wind + HVDC) and other large onshore programmes.
- Dominion Energy Coastal Virginia Offshore Wind 2.6 GW (~USD 10.9bn) - regulated offshore.
- Orsted Global offshore leader; Revolution/Sunrise Wind hit by 2025 US stop-work orders; Hornsea 4 cancelled May-2025; large 2025 rights issue and asset sales (50% Hornsea 3 to Apollo).
- RWE Major offshore developer (Sofia, Thor, Nordseecluster); paused US offshore.
- Iberdrola / EDPR / Vattenfall / SSE East Anglia, Dogger Bank (SSE/Equinor), Baltic projects.
- Equinor Empire Wind 1 (COD ~2027) after 2025 stop-work and Dec-2025 lease suspension overturned Jan-2026.
- ACWA Power / Masdar Saudi/Egypt/Uzbek GW-scale onshore wind with Chinese OEMs.
Suppliers · 12
- Suzlon Energy Largest Indian OEM (S144 3.15 MW platform), ~5+ GW order book, debt-free turnaround.
- Inox Wind 3.3 MW platform; EPC + O&M via Inox Green.
- Vestas Market leader outside China; V236-15 MW offshore; Indian factories in Chennai.
- Siemens Gamesa (Siemens Energy) Offshore leader; onshore 4.X/5.X quality issues caused multi-billion losses 2023-25.
- GE Vernova Wind Leading US onshore OEM; Haliade-X offshore troubles (Vineyard Wind blade failure 2024).
- Nordex Onshore N163/N175 for Europe; returned to profitability 2024-25.
- Envision / Goldwind / Mingyang / Windey Chinese OEMs with ~50% lower turbine prices; Envision manufacturing in India.
- Prysmian / NKT / Nexans / LS Cable HV/HVDC export cables; capacity booked to ~2028-30.
- Sif / EEW / Bladt / CS Wind Monopiles, transition pieces and towers.
- Cadeler / DEME / Jan De Nul / Van Oord Wind turbine installation vessels and foundation installation; vessel scarcity.
- LM Wind Power / TPI Composites Blades; TPI filed for Chapter 11 in 2025 highlighting supply-chain fragility.
- Senvion India / KP Energy / Inox Green Balance-of-plant EPC and O&M for Indian wind farms.
Customers · 6
- Indian discoms via SECI/NTPC/NHPC hybrid and FDRE tenders Wind valued for evening output in RTC structures.
- C&I green open access buyers Gujarat/Tamil Nadu/Karnataka wind for group-captive.
- Hyperscalers and tech companies Amazon, Microsoft, Google are top buyers of EU offshore/onshore PPAs.
- UK/EU governments via CfD UK AR6/AR7 and EU two-sided CfDs.
- US Northeast states (NY, NJ, MA, VA) State offshore wind solicitations; several contracts cancelled/rebid 2023-25.
- Green hydrogen producers Wind-solar hybrid for electrolysers (India SIGHT, Oman, NEOM).
Project template
Work breakdown
Share of total duration per step; steps overlap where predecessors allow, as the bars show. O / ML / P are optimistic, most-likely and pessimistic multipliers on each step's duration; the hatched tail is the pessimistic case.
| ID | Step & timing | Share | O / ML / P |
|---|---|---|---|
| A100 | Wind measurement campaign (12-24 months met-mast/LiDAR) and site controlDevelop · factors: Policy | 30% | 0.9 / 1 / 1.4 |
| A110 | Environmental/ecological studies and permits (incl. seabed lease, COP for offshore)Develop · factors: Policy | 30% | 0.85 / 1 / 2 |
| A120 | Grid connection agreement / interconnectionDevelop · factors: Grid queue | 25% | 0.85 / 1 / 1.8 |
| A130 | Offtake (PPA/CfD/auction) and financial closeDevelop · factors: Interest rates, Power price, Policy | 12% | 0.9 / 1 / 1.8 |
| B100 | Micro-siting, foundation/geotech design, electrical designEngineer · EPC · factors: Labour | 12% | 0.9 / 1 / 1.3 |
| C100 | Turbine supply agreement and manufacturing slotsProcure · OEM · factors: Electrical equipment, Steel, Copper | 25% | 0.9 / 1 / 1.5 |
| C110 | Foundations/towers/monopiles and cables (array/export)Procure · OEM · factors: Steel, Copper, Electrical equipment | 30% | 0.9 / 1 / 1.6 |
| C120 | Substation transformers and installation vessels/cranesProcure · OEM · factors: Electrical equipment, Oil, Labour | 25% | 0.9 / 1 / 1.6 |
| D100 | Civil works: roads, crane pads, foundations (onshore) / monopile installation (offshore)Construct · EPC · factors: Construction materials, Steel, Labour | 25% | 0.9 / 1 / 1.5 |
| D110 | Turbine erection (tower, nacelle, blades)Construct · OEM · factors: Labour, Oil, Electrical equipment | 20% | 0.9 / 1 / 1.6 |
| D120 | Array cabling, substations and export lineConstruct · EPC · factors: Copper, Electrical equipment, Labour | 20% | 0.9 / 1 / 1.6 |
| E100 | Commissioning, grid-code tests, reliability run and CODCommission · OEM · factors: Grid queue, Electrical equipment | 8% | 0.9 / 1 / 1.6 |
Cost breakdown
Share of capex by line, with the commodity exposure of each line (the share of that line that moves with the commodity).
Financial template
Revenue model
Long-term PPAs (India SECI/state hybrid tenders, US utility/corporate), two-sided CfDs and ORECs for offshore, merchant capture-price tail plus RECs/GOs; OEMs earn turbine sale margins and long-term service agreements.
Margin driver
Net capacity factor
Ramp-up
1 year to steady state
How Capibud uses this pack
A pack is a starting position, not a forecast. When a wind power decision opens in Capibud, pack v1.0.0 is copied in and pinned to that decision. The 13 parameters, 10 swing factors and templates the committee saw stay attached to the decision record, even after the pack is next refreshed.
Parameter ranges and WBS durations seed the P50, P80 and P90 for capex, schedule and value. Your own estimates, vendor quotes and actuals replace pack defaults line by line, and the record shows which numbers are still defaults.
Each swing factor is wired to shared factors; here the heaviest are policy, electrical equipment, copper and interest rates. A move in one factor hits every exposed project in the same scenario, which is how the capital committee sees concentration across a book rather than project by project.
The 12 price feeds and 22 listed tickers feed the brain, which watches for drivers moving outside their pack range and drafts the change for a person to review.
Shared factors behind this pack's swing factors
- Policy
- Electrical equipment
- Copper
- Interest rates
- Steel
- Grid queue
- Labour
Capex tied to a shared factor
- Steel23.2%
- Electrical equipment23%
- Copper11.6%
- Policy10.2%
- Labour9.7%
- Construction materials8.7%
- Interest rates6%
Sources
Every link opens the original source in a new tab. Values marked as estimates are informed estimates by the Capibud research team.
- iea.orghttps://www.iea.org/reports/renewables-2025/executive-summary
- lazard.comhttps://www.lazard.com/media/kcfconhf/lazards-lcoeplus_vf.pdf
- eia.govhttps://www.eia.gov/outlooks/aeo/assumptions/pdf/EMM_Assumptions.pdf
- doi.orghttps://doi.org/10.1016/j.erss.2014.07.016
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Wind_power_in_India
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Revolution_Wind
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Empire_Wind
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Hornsea_Wind_Farm
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Offshore_wind_power
- en.wikipedia.orghttps://en.wikipedia.org/wiki/One_Big_Beautiful_Bill_Act
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PCU3359293359291
- mnre.gov.inhttps://mnre.gov.in/
Bring us one real decision in wind power.
We start it from the Wind power pack v1.0.0: 13 parameters, 10 swing factors and the 12-step project template, pinned to your decision.