Industry brief · Materials, infrastructure & industry
Iron & steelBF-BOF, DRI-EAF, green steel
Integrated (blast furnace / basic oxygen furnace) and electric (gas- or coal-based DRI, scrap EAF) steelmaking, plus near-zero routes using hydrogen DRI. India is the main growth market (National Steel Policy target 300 Mtpa by 2030-31), the US is re-shoring behind 50% Section 232 tariffs, and the EU is decarbonising under ETS/CBAM (definitive since 1 Jan 2026). Projects are multi-year, OEM-heavy and highly exposed to raw-material spreads, power/gas prices and trade policy.
Pack v1.0.0 · updated 5 Oct 2026 · 19 cited sources · 15 parameters · 11 swing factors · 1 source conflict shown side by side.
At a glance
Pack defaults with their low–high range. Overruns are sector means as a share of the original budget or schedule. All parameters and sources
Sub-industries
Capex intensity ranges by configuration. The unit changes with the asset, so compare within a row, not across rows.
| Sub-industry | Capex intensity | Notes |
|---|---|---|
| Integrated BF-BOF steel plantCoke ovens/sinter/pellet + blast furnace + BOF + casting + hot strip / long mills. | 600–2,500USD per tpa crude steel | India brownfield ~USD 600-700/tpa (Tata Steel Kalinganagar +5 Mtpa for INR 27,000 cr, May 2025); India greenfield ~USD 900-1,200/tpa; US/EU greenfield USD 1,800-2,500/tpa (estimate). |
| Gas-based DRI + EAFMidrex/HYL-Energiron shaft furnace on natural gas feeding an EAF; hydrogen-ready designs. | 800–2,200USD per tpa crude steel | Hyundai Steel's Louisiana DRI-EAF (2.7 Mtpa, ~USD 5.8bn announced 2025) sits at the top of the range (estimate). |
| Coal-based DRI (rotary kiln) + induction/EAFIndia's secondary sector; India is the world's largest DRI producer. | 300–600USD per tpa crude steel | Low capex, high CO2 (~2.5-3.1 tCO2/t, estimate). https://en.wikipedia.org/wiki/Direct_reduced_iron |
| Scrap-based EAF mini-millFlat or long products from scrap/pig iron/DRI blends. | 500–1,300USD per tpa crude steel | US flat-rolled mini-mills (Nucor WV, Steel Dynamics Sinton) ~USD 1,000-1,200/tpa (estimate). |
| Hydrogen DRI green steelElectrolyser + H2 shaft furnace + EAF with renewable PPA; e.g. Stegra (Boden), HYBRIT, thyssenkrupp Duisburg DRI. | 1,800–3,200USD per tpa crude steel | Electrolyser and power infrastructure dominate; several EU projects paused or re-scoped 2025-26 (estimate). |
| Downstream rolling, coating & pipesCRM, galvanising/colour-coating, electrical steel (CRGO/CRNO), pipes. | 250–900USD per tpa product | Electrical steel lines at the high end (estimate). |
Value chain
Inputs
- iron ore fines/lump/pellets
- coking coal & PCI
- natural gas or hydrogen
- ferrous scrap
- limestone/dolomite
- ferro-alloys
- graphite electrodes
- industrial oxygen
- electricity
- refractories
Process
- beneficiation & pelletising
- coke making
- sintering
- blast furnace ironmaking
- direct reduction (shaft/rotary kiln)
- BOF / EAF steelmaking
- secondary metallurgy (LF/VD)
- continuous casting
- hot rolling
- cold rolling, annealing & coating
Outputs
- HRC/CRC & coated flats
- rebar, wire rod & structurals
- plates
- electrical steel
- pipes & tubes
- slag (to cement)
- by-product gases & power
Parameters
15 parameters: 3 sourced, 12 informed estimates. The bar shows the low–high range with the default marked; estimates are labelled and never presented as observed data.
| Parameter | Default & range | Evidence | Source |
|---|---|---|---|
| Capex intensityDefault = India greenfield integrated; brownfield datapoint: Tata Steel Kalinganagar +5 Mtpa for INR 27,000 cr (~USD 615/tpa) https://en.wikipedia.org/wiki/Tata_Steel | 1,000 USD per tpa crude steelrange 550–3,000 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| Construction monthsMoSPI steel-ministry projects: median planned duration ~31 months (Capibud parse of QPISR Q1 FY26). | 42 monthsrange 28–60 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| Cost overrun mean sources disagreeMoSPI Q1 FY2025-26: 20 Ministry of Steel projects, original INR 16,297 cr vs anticipated INR 20,229 cr (+24.1%). | 24%range 5%–60% | sourcedas of 5 Oct 2026 | paimana-proj.mospi.gov.in |
| Schedule overrun meanCapibud parse of QPISR Q1 FY26 project list: steel n=13, 38% delayed, mean delay = 37% of planned duration. | 37%range 0%–100% | sourcedas of 5 Oct 2026 | paimana-proj.mospi.gov.in |
| Asset life (years)Blast furnace campaigns 15-20 years between relines; plant economic life 30-50 years. | 40 yearsrange 30–50 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| WACCIndia nominal; India 10Y G-sec 6.78% (Jul 2026, FRED INDIRLTLT01STM) + equity/credit premia. US ~0.09-0.10 with 10Y at 5.24% (Oct 2026). | 11%range 8.5%–13% | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| Typical IRR | 14%range 7%–20% | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| UtilizationArcelorMittal 2025: 55.6 Mt produced on 74.6 Mt capacity (75%); Indian majors run 80-90% (estimate). | 80%range 65%–92% | sourcedas of 5 Oct 2026 | en.wikipedia.org |
| Opex % of revenue | 82%range 72%–92% | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| EBITDA marginCycle-average for integrated producers; Cleveland-Cliffs posted a USD 1.43bn net loss on USD 18.6bn revenue in 2025 (https://en.wikipedia.org/wiki/Cleveland-Cliffs). | 15%range 6%–25% | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| CO2 intensity BF BOF | 2.2 tCO2 per t crude steelrange 1.8–2.6 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| CO2 intensity H2 DRI EAF | 0.3 tCO2 per t crude steelrange 0.05–0.6 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| EAF power kWh per t | 450 kWh/t liquid steelrange 380–600 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| H2 per t DRI | 55 kg H2 per t DRIrange 50–65 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
| Ramp up (months) | 18 monthsrange 9–36 | estimateas of 5 Oct 2026 | Informed estimate; no single source |
Where sources disagree
Kept side by side, not averaged. The pack default is in the table above.
Cost overrun mean
Indian monitoring data vs the default; same source family, different vintages possible.
What moves value
Sorted by expected cost (probability × cost impact). Impacts are typical values for the sector; each one is driven by the shared factors listed, which is how one shock reaches several projects at once.
Market signals
What moves the case
Key variables with their typical range and what they hit in the model.
| Variable | Typical range | Affects |
|---|---|---|
| Hot-rolled coil price (US Midwest)~USD 10/t HRC move shifts EBITDA by roughly 1-1.5 pp of margin for a flat producer (estimate). | 650–1,400USD/short ton | Revenue |
| Iron ore 62% Fe CFR China~1.6 t ore per t hot metal; +USD 10/t ore ≈ +USD 16/t cost. | 80–160USD/dmt | Opex |
| Coal price (Australia, thermal proxy for coking coal trend)~0.75-0.8 t coking coal per t hot metal; coking coal trades at a premium to this proxy. | 100–400USD/t | Opex |
| US PPI steel mill productsTracks realised US flat/long prices and structural steel in capex estimates. | 250–420index | Revenue, Capex |
| Natural gas (Henry Hub)Gas-DRI uses ~10-11 GJ/t DRI; +USD 1/MMBtu ≈ +USD 10/t DRI (estimate). | 2–9USD/MMBtu | Opex |
| Industrial electricity priceEAF ~400-500 kWh/t; H2-DRI route ~3.5-4 MWh/t incl. electrolysis (estimate). | 280–360index | Opex |
| Steel spread (HRC minus raw-material basket)Primary margin driver; computed from HRC, ore and coal feeds. | 200–650USD/t | Revenue, Opex |
| Capacity utilisationArcelorMittal ran ~75% in 2025 (55.6 of 74.6 Mt). | 65%–92% | Revenue |
Show 3 more variables
| Variable | Typical range | Affects |
|---|---|---|
| EU ETS / CBAM carbon costBF-BOF ~1.9-2.3 tCO2/t; free allocation phases out 2026-2034 as CBAM phases in. | 60–130EUR/tCO2 | Opex, Revenue |
| Import tariff / safeguard levelUS s232 50% (June 2025); India safeguard duty on flats (2025); EU safeguard/quota regime. | 0%–50% | Revenue |
| Long-term rates (US 10Y / India 10Y)+100 bp lifts WACC ~60-80 bp for a 50-60% debt-funded project. | 3–7.5 | Financing |
Price feeds (16)
| Series | Source / id | Unit | Frequency |
|---|---|---|---|
| Global price of iron ore | PIORECRUSDMFRED | USD/dmt | monthly |
| Global price of coal, Australia | PCOALAUUSDMFRED | USD/t | monthly |
| PPI: steel mill products | WPU1017FRED | index 1982=100 | monthly |
| PPI: iron and steel | WPU101FRED | index 1982=100 | monthly |
| PPI: hot rolled steel sheet & strip | PCU3311103311105FRED | index | monthly |
| PPI: construction materials | WPUSI012011FRED | index 1982=100 | monthly |
| Henry Hub natural gas spot | DHHNGSPFRED | USD/MMBtu | daily |
| PPI: industrial electric power | WPU0543FRED | index | monthly |
Show 8 more feeds
| Series | Source / id | Unit | Frequency |
|---|---|---|---|
| US 10-year Treasury yield | DGS10FRED | % | daily |
| India 10-year government bond yield | INDIRLTLT01STMFRED | % | monthly |
| US Midwest HRC futures (CME) | HRC=FYahoo | USD/short ton | daily |
| Iron ore 62% Fe CFR China futures | TIO=FYahoo | USD/dmt | daily |
| NIFTY Metal index | ^CNXMETALYahoo | index | daily |
| VanEck Steel ETF | SLXYahoo | USD | daily |
| EU ETS carbon allowance (EUA) | ICE:EUA front-monthother | EUR/tCO2 | daily |
| India WPI: basic metals / mild steel | OEA:WPI-basic-metalsother | index | monthly |
Listed tickers (18)
Market context only: these prices tend to react first when a driver moves. Named for context; no affiliation.
Operators · 14
- TATASTEEL.NS Tata Steel NSE · IN
- JSWSTEEL.NS JSW Steel NSE · IN
- SAIL.NS Steel Authority of India NSE · IN
- JINDALSTEL.NS Jindal Steel NSE · IN
- LLOYDSME.NS Lloyds Metals & Energy NSE · IN
- NUE Nucor NYSE · US
- STLD Steel Dynamics NASDAQ · US
- CLF Cleveland-Cliffs NYSE · US
- MT ArcelorMittal NYSE · EU
- TKA.DE thyssenkrupp XETRA · EU
- SZG.DE Salzgitter XETRA · EU
- SSAB-B.ST SSAB Nasdaq Stockholm · EU
- VOE.VI voestalpine Wiener Börse · EU
- 5401.T Nippon Steel (owner of U.S. Steel) TSE · APAC
Suppliers · 4
- NMDC.NS NMDC (iron ore) NSE · IN
- HEG.NS HEG (graphite electrodes) NSE · IN
- LIN Linde (industrial gases) NYSE · US
- DAN.MI Danieli (OEM) Borsa Italiana · EU
Trends and research findings
Trends
- CBAM definitive regime live2026-2034
EU CBAM covering iron & steel, aluminium, cement, fertilisers, electricity and hydrogen moved to its definitive (paying) regime on 1 Jan 2026; free ETS allocation phases down in parallel.
- US 50% metals tariffs restructured2025-2028
Section 232 steel tariffs rose to 50% in June 2025; April 2026 clarification: 50% on articles made wholly of steel, 25% on derivatives, 10% if made with US-melted steel.
- US steel prices at multi-year highs2026-2027
US PPI steel mill products +23.4% y/y and iron & steel +17.9% y/y in Aug 2026; CME Midwest HRC ~USD 1,300/st in Oct 2026.
- India capacity wave2025-2031
Brownfield expansions (Tata Kalinganagar 3→8 Mtpa) plus at least 12 plants / 60 Mtpa planned in Odisha by 2030 toward the 300 Mtpa policy target.
- New iron-ore supply: Simandou2026-2030
Simandou (Guinea) began exports Nov-Dec 2025 after ~USD 20bn of mine, rail and port investment; up to 95 Mtpa at full rate, pressuring seaborne ore prices.
- 2026 Gulf war raises gas/energy risk for DRI2026-2027
Hormuz has been largely blocked since 28 Feb 2026 (≈20% of world LNG transits); Brent averaged >USD 100/bbl in Mar-May and Sep 2026, raising gas-DRI and logistics costs.
- Consolidation and foreign ownership in US2025-2028
Nippon Steel completed the acquisition of U.S. Steel on 18 June 2025 under a national-security agreement.
Research findings
- MoSPI steel-sector cost overrun (Q1 FY2025-26)
20 Ministry of Steel projects ≥INR 150 cr: original cost INR 16,297 cr vs anticipated INR 20,229 cr (+24.1%).
- MoSPI PAIMANA flash (Mar 2026)
18 steel-sector projects: original INR 17,812 cr, revised INR 21,050 cr (+18.2%); all 1,941 central projects: INR 35.89 lakh cr → 41.50 lakh cr (+15.6%).
- Capibud schedule analysis of MoSPI project list
Parsed 991 of 1,734 Q1 FY26 projects: 59% delayed overall, median delay 8 months; steel n=13: 38% delayed, mean delay 37% of planned duration.
- Reference class for heavy industrial projects
Flyvbjerg et al. (2026, N=11,011): mean real cost overrun mining 27%, oil & gas 31%, fossil thermal power 18%, buildings 58% — steel plants sit between mining and oil & gas.
- Brownfield capex benchmark India
Tata Steel Kalinganagar phase 2 added 5 Mtpa for INR 27,000 cr (~INR 5,400 cr/Mtpa, ~USD 615/tpa at INR 88/USD).
- Utilisation benchmark
ArcelorMittal produced 55.6 Mt on 74.6 Mt capacity in 2025 (~75% utilisation) with revenue USD 61.4bn and net income USD 3.15bn.
KPIs, regions and who builds
KPIs the pack tracks
Regional notes
| India | Fastest-growing major market; ~150+ Mt crude output and capacity heading to 300 Mtpa by 2030-31. Coal-DRI-heavy secondary sector, captive ore advantage, coking coal import dependence. Safeguard duty on flat imports (2025) and Green Steel Taxonomy (Dec 2024). MoSPI shows +18-24% cost overrun on central steel projects. |
|---|---|
| United States | EAF share ~70% (estimate); new flat-rolled mini-mills and DRI; 50% s232 tariffs support prices but raise equipment/structural costs; Nippon-U.S. Steel deal closed June 2025. |
| Europe | Decarbonisation via DRI-EAF backed by state aid, but several H2-DRI projects slowed in 2025-26 on hydrogen/power cost; CBAM definitive from 2026; import safeguard regime tightening; high gas price exposure after the 2026 Gulf war. |
| Middle East | Gas-based DRI hubs (Saudi, Oman, UAE) targeting low-carbon HBI exports to Europe; Gulf energy infrastructure exposed to 2026 Iran war disruption. |
Who builds and operates
Named for context; no affiliation. These are public market participants drawn from the research behind the pack. They are not Capibud clients or partners.
Operators · 16
- Tata Steel Kalinganagar expanded 3→8 Mtpa (May 2025, INR 27,000 cr); Port Talbot (UK) EAF conversion.
- JSW Steel Largest Indian producer; Vijayanagar ~12 Mtpa single site; capacity target ~50 Mtpa by FY31 (estimate).
- Steel Authority of India (SAIL) State-owned; Bhilai, Bokaro, Rourkela, Durgapur, Burnpur; IISCO expansion planned.
- ArcelorMittal Nippon Steel India Hazira expansion to ~15 Mtpa; greenfield plans in Andhra Pradesh (estimate).
- Jindal Steel (JSPL) Angul coal-gasification DRI + BF; expansion to ~15.9 Mtpa (estimate).
- Nucor Largest US producer (EAF); West Virginia sheet mill under construction.
- Steel Dynamics Sinton TX flat-rolled EAF; aluminium rolling diversification.
- Cleveland-Cliffs Integrated BF-BOF; 2025 net loss USD 1.43bn; idled Dearborn partially (Mar 2025).
- U.S. Steel (Nippon Steel) Acquired by Nippon Steel on 18 June 2025 with US 'golden share'; committed new investments (estimate ~USD 11bn by 2028).
- Hyundai Steel Announced Louisiana DRI-EAF mill (~2.7 Mtpa) in 2025 (estimate).
- ArcelorMittal 2025: 74.6 Mt capacity, 55.6 Mt produced, revenue USD 61.4bn; scaled back EU H2-DRI plans (estimate).
- thyssenkrupp Steel Europe Duisburg H2-ready DRI (2.5 Mtpa) under construction with state aid (estimate).
- Salzgitter SALCOS staged DRI-EAF transformation (estimate).
- SSAB HYBRIT partner; Oxelösund EAF conversion (estimate).
- voestalpine greentec steel: EAFs at Linz/Donawitz from 2027 (estimate).
- Stegra (ex-H2 Green Steel) Boden integrated H2-DRI-EAF; financing strain reported 2025 (estimate).
Suppliers · 13
- SMS group (incl. Paul Wurth) BF, BOF/EAF, casters, rolling mills; DRI via Midrex partnership.
- Danieli Mini-mills, Energiron DRI (with Tenova), rolling.
- Primetals Technologies (Mitsubishi Heavy Industries) Integrated plant equipment, HYFOR hydrogen fines reduction.
- Midrex Technologies (Kobe Steel) Dominant gas-DRI shaft technology (~60%+ of world DRI, estimate).
- Tenova HYL / Energiron Alternative DRI technology; hydrogen-ready.
- MECON Indian PSU engineering consultant for SAIL/RINL expansions.
- Larsen & Toubro (Minerals & Metals) BF, coke-oven and sinter EPC in India.
- Linde / Air Products / INOX Air Oxygen/nitrogen plants (BOO), hydrogen supply.
- HEG / Graphite India / GrafTech Graphite electrodes for EAF.
- NMDC / Vale / Rio Tinto / BHP Iron ore supply; Simandou (Guinea) began exports Dec 2025, up to 95 Mtpa at full rate.
- Coal India / BHP Mitsubishi Alliance / Teck-Glencore (EVR) Coking coal; India imports ~85% of coking coal (estimate).
- RHI Magnesita Refractories.
- Thyssenkrupp Nucera / John Cockerill Electrolysers for H2-DRI.
Customers · 6
- Construction & infrastructure Largest end use in India (~60%+ of demand, estimate).
- Automotive OEMs Maruti, Tata, M&M, GM, Ford, VW; affected by US auto tariffs.
- Capital goods & machinery Industrial capex cycle.
- Energy & pipelines Grid and renewables build-out.
- Railways & defence Indian Railways capex; shipbuilding.
- Consumer durables/appliances US s232 derivatives extended to appliances (June 2025).
Project template
Work breakdown
Share of total duration per step; steps overlap where predecessors allow, as the bars show. O / ML / P are optimistic, most-likely and pessimistic multipliers on each step's duration; the hatched tail is the pessimistic case.
| ID | Step & timing | Share | O / ML / P |
|---|---|---|---|
| A100 | Site, raw-material linkage (ore/coal/gas) & land acquisitionDevelop · factors: Policy | 12% | 0.9 / 1 / 1.8 |
| A200 | Environmental, forest & consent-to-establish clearancesDevelop · factors: Policy | 10% | 0.9 / 1 / 1.7 |
| A300 | Technology selection & licensor basic engineering (BF/DRI, BOF/EAF)Engineer · OEM · factors: Electrical equipment | 8% | 0.9 / 1 / 1.3 |
| A400 | Detailed engineering & FEED close-outEngineer · EPC · factors: Labour | 12% | 0.9 / 1 / 1.3 |
| A500 | Long-lead procurement: furnace, converters, caster, rolling mill, transformersProcure · OEM · factors: Electrical equipment, Steel | 22% | 0.9 / 1 / 1.5 |
| A600 | Site grading, piling & heavy foundationsConstruct · EPC · factors: Construction materials, Labour | 12% | 0.9 / 1 / 1.4 |
| A700 | Raw-material handling, coke ovens / pellet / sinter plantsConstruct · EPC · factors: Steel, Construction materials, Labour | 16% | 0.9 / 1 / 1.4 |
| A800 | Ironmaking unit erection (blast furnace or DRI module)Construct · OEM · factors: Steel, Labour | 20% | 0.9 / 1 / 1.5 |
| A900 | Steel melt shop (BOF/EAF) & continuous castingConstruct · OEM · factors: Steel, Electrical equipment, Labour | 16% | 0.9 / 1 / 1.4 |
| A1000 | Hot strip / bar & wire rod mill erectionConstruct · OEM · factors: Electrical equipment, Labour | 15% | 0.9 / 1 / 1.4 |
| A1100 | Power, oxygen plant, water & grid interconnectionConstruct · EPC · factors: Electrical equipment, Grid queue, Copper | 14% | 0.9 / 1 / 1.6 |
| A1200 | Cold commissioning, blow-in & hot trialsCommission · OEM · factors: Labour | 6% | 0.9 / 1 / 1.6 |
| A1300 | Ramp-up to rated capacity & performance guarantee testsCommission · factors: Labour, Power price | 10% | 0.8 / 1 / 1.8 |
Cost breakdown
Share of capex by line, with the commodity exposure of each line (the share of that line that moves with the commodity).
Financial template
Revenue model
Sale of finished steel (flat/long/plate) priced off HRC/rebar benchmarks; margin = steel spread over iron ore, coking coal (or gas/H2) and scrap, less conversion cost; carbon cost/CBAM pass-through in EU.
Margin driver
Steel spread (HRC minus raw-material basket)
Ramp-up
2 years to steady state
How Capibud uses this pack
A pack is a starting position, not a forecast. When a iron & steel decision opens in Capibud, pack v1.0.0 is copied in and pinned to that decision. The 15 parameters, 11 swing factors and templates the committee saw stay attached to the decision record, even after the pack is next refreshed.
Parameter ranges and WBS durations seed the P50, P80 and P90 for capex, schedule and value. Your own estimates, vendor quotes and actuals replace pack defaults line by line, and the record shows which numbers are still defaults.
Each swing factor is wired to shared factors; here the heaviest are policy, power price, grid queue and labour. A move in one factor hits every exposed project in the same scenario, which is how the capital committee sees concentration across a book rather than project by project.
The 16 price feeds and 18 listed tickers feed the brain, which watches for drivers moving outside their pack range and drafts the change for a person to review.
Shared factors behind this pack's swing factors
- Policy
- Power price
- Grid queue
- Labour
- Steel
- Electrical equipment
- Interest rates
Capex tied to a shared factor
- Steel27%
- Electrical equipment20.2%
- Labour9%
- Construction materials8%
- Interest rates3%
- Grid queue1.6%
- Copper1.5%
Sources
Every link opens the original source in a new tab. Values marked as estimates are informed estimates by the Capibud research team.
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/WPU1017
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/WPU101
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PIORECRUSDM
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PCOALAUUSDM
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/DGS10
- fred.stlouisfed.orghttps://fred.stlouisfed.org/series/INDIRLTLT01STM
- paimana-proj.mospi.gov.inhttps://paimana-proj.mospi.gov.in/Content/ArchiveReport/quarterly/2025-26/QPISR_QR_1st_2025-26.pdf
- paimana-proj.mospi.gov.inhttps://paimana-proj.mospi.gov.in/Content/ArchiveReport/flash/2025-26/FlashReport_March_2026.pdf
- arxiv.orghttps://arxiv.org/abs/2606.15757
- taxation-customs.ec.europa.euhttps://taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism_en
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Tariffs_in_the_second_Trump_administration
- en.wikipedia.orghttps://en.wikipedia.org/wiki/2026_Strait_of_Hormuz_crisis
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Tata_Steel
- en.wikipedia.orghttps://en.wikipedia.org/wiki/ArcelorMittal
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Cleveland-Cliffs
- en.wikipedia.orghttps://en.wikipedia.org/wiki/U.S._Steel
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Simandou_mine
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Iron_and_steel_industry_in_India
- en.wikipedia.orghttps://en.wikipedia.org/wiki/Direct_reduced_iron
Cited without a link
- MoSPI Q1 FY2025-26 (Ministry of Steel, 20 projects)
Bring us one real decision in iron & steel.
We start it from the Iron & steel pack v1.0.0: 15 parameters, 11 swing factors and the 13-step project template, pinned to your decision.