Lithium-ion cell gigafactories (LFP, NMC, emerging sodium-ion), upstream active materials (pCAM/CAM, graphite/silicon anodes), pack assembly and EV/e-2W OEM assembly plants. China dominates (~75-85% of cell capacity; Chinese automakers supplied 60% of global EV sales in 2025), while US/EU/India build localised supply under IRA/OBBBA 45X, EU Battery Regulation and India's ACC-PLI. Capital risk is acute: Northvolt's 2024-25 bankruptcy, US EV credit expiry (30-Sep-2025) and resulting write-downs/plant re-purposing, ramp/yield failures, metal price swings and policy whiplash.

10 swing factors · circle size = months of delay0%20%40%60%5%10%20%30%Probability →Cost impact →Ramp/yield failure and high scrap rates: 40% likely, 25% cost impact, 18 monthsDemand/policy whiplash (credit expiry, CO2 standard relaxation): 45% likely, 0% cost impact, 12 monthsFinancing and sponsor balance-sheet risk: 35% likely, 5% cost impact, 12 monthsFEOC/localisation rule compliance (45X, ACC-PLI DVA): 35% likely, 10% cost impact, 6 monthsEquipment supply and vendor dependence (Chinese tool makers, visas): 30% likely, 5% cost impact, 6 monthsConstruction labour and immigration enforcement: 25% likely, 5% cost impact, 4 monthsUtilities: power, water and green-power availability: 20% likely, 3% cost impact, 4 monthsCritical mineral price and supply shocks (Li, Ni, Co, graphite, REEs): 35% likely, 8% cost impact, 3 monthsSafety incidents (fires in plants/vehicles) and recalls: 15% likely, 3% cost impact, 3 monthsChinese competition and price deflation: 45% likely, 0% cost impact, 0 monthsRamp/yield failure and…FEOC/localisation rule…Critical mineral price and…

Pack v1.0.0 · updated 5 Oct 2026 · 10 cited sources · 13 parameters · 10 swing factors.

At a glance

90Capex intensity · USD million per GWh/yr (cell plant, ex-China)range 40–130 · estimate
30Construction time · months (groundbreak to SOP; full ramp +12-24)range 18–48 · estimate
25%Mean cost overrunrange 0%–100% · estimate
50%Mean schedule overrunrange 10%–200% · sourced

Pack defaults with their low–high range. Overruns are sector means as a share of the original budget or schedule. All parameters and sources

Sub-industries

Capex intensity ranges by configuration. The unit changes with the asset, so compare within a row, not across rows.

Sub-industryCapex intensityNotes
Li-ion cell gigafactories (LFP/NMC/LMFP, sodium-ion)10-60 GWh/yr cell plants: CATL, BYD, LGES, Panasonic, Samsung SDI, SK On, Tesla, AESC; India: Ola (Krishnagiri), Agratas/Tata (Sanand), Reliance (Jamnagar), Amara Raja, Exide.40–130USD million per GWh/yrestimate: China ~USD 40-60m/GWh; US/EU/India ~USD 80-130m/GWh (e.g., Agratas Sanand 20 GWh ~Rs 13,000 crore ~USD 70m/GWh at INR 95.8).
Cathode (pCAM/CAM), anode and electrolyte plantsUmicore, EcoPro, POSCO Future M, L&F, BASF; Epsilon (India anode/cathode), Himadri; graphite anode (Novonix, Syrah).15–60USD million per GWh-equivalentestimate.
EV and e-2W/3W vehicle assembly plantsBody-in-white, paint, general assembly, battery pack lines; Tesla, BYD, Hyundai-Kia Metaplant, VW, Tata Motors PV (Sanand), M&M (Chakan), Ola/Ather/TVS e-2W plants; VinFast Tamil Nadu.300–10,000USD per unit of annual capacityestimate: cars USD 4,000-10,000 per unit/yr (e.g., USD 1-2.5bn for 200-300k units); e-2W USD 300-800 per unit/yr.
Battery pack/module assemblyPack integration (BMS, thermal) by OEMs and suppliers (Tata AutoComp, Exicom, Log9).5–20USD million per GWh/yrestimate.
Battery recycling and black-mass refiningRedwood, Li-Cycle (restructured), Umicore, Attero, Lohum, Gravita.50–250USD million per 10 kt/yrestimate; economics depend on Ni/Co/Li prices and EU recycled-content rules.

Value chain

Inputs

  • lithium carbonate/hydroxide
  • nickel, cobalt, manganese sulphates
  • iron phosphate / LFP precursors
  • graphite (natural/synthetic) and silicon
  • copper and aluminium foils
  • electrolyte (LiPF6) and separators
  • dry rooms, coaters, calenders, formation/aging equipment
  • low-carbon power and water
  • automotive steel/aluminium, semiconductors (vehicle plants)

Process

  • electrode slurry mixing and coating
  • calendering and slitting
  • cell assembly (stacking/winding), electrolyte filling
  • formation and aging (largest energy use)
  • module/pack integration
  • vehicle body, paint and general assembly
  • end-of-line testing and homologation
  • recycling of scrap and end-of-life batteries

Outputs

  • EV, ESS and e-2W cells
  • battery packs
  • BEVs/PHEVs, e-buses, e-trucks, e-2W/3W
  • cathode/anode materials
  • recycled black mass and metals

Parameters

13 parameters: 3 sourced, 10 informed estimates. The bar shows the low–high range with the default marked; estimates are labelled and never presented as observed data.

ParameterDefault & rangeEvidenceSource
Capex intensity(cell plant, ex-China)90 USD million per GWh/yrrange 40–130estimateas of 5 Oct 2026Informed estimate; no single source
Construction months(groundbreak to SOP; full ramp +12-24)30 monthsrange 18–48estimateas of 5 Oct 2026Informed estimate; no single source
Cost overrun mean25%range 0%–100%estimateas of 5 Oct 2026greenfield Western gigafactories
Schedule overrun mean50%range 10%–200%sourcedas of 5 Oct 2026en.wikipedia.org
Asset life (years)(equipment 8-12)15 yearsrange 8–25estimateas of 5 Oct 2026Informed estimate; no single source
WACC10%range 7%–14%estimateas of 5 Oct 2026Informed estimate; no single source
Typical IRR12%range −10%–25%estimateas of 5 Oct 2026CATL-class returns ~20%; new entrants frequently negative
Utilization65%range 20%–90%estimateas of 5 Oct 2026Informed estimate; no single source
Opex % of revenue(materials ~65-75% of cell cost)82%range 70%–95%estimateas of 5 Oct 2026Informed estimate; no single source
EBITDA margin12%range −20%–30%estimateas of 5 Oct 2026CATL ~25%, Korean cell makers 5-15%, new entrants negative
KWh per EV60 kWh per BEV carrange 20–110estimateas of 5 Oct 2026Informed estimate; no single source
Global EV sales 2026 mn23 million carsrange 20–25sourcedas of 5 Oct 2026iea.org
US 45x cell credit (USD per kWh)(cells)35 USD/kWhrange 0–35sourcedas of 5 Oct 2026en.wikipedia.org

What moves value

Sorted by expected cost (probability × cost impact). Impacts are typical values for the sector; each one is driven by the shared factors listed, which is how one shock reaches several projects at once.

Swing factorProbabilityCost impactSchedule
Ramp/yield failure and high scrap ratesTechnical Shared factors: Labour 0.5 · Electrical equipment 0.5Watch: scrap %; OEM qualification status; equipment vendor support presence
40%
25%
18 mo
FEOC/localisation rule compliance (45X, ACC-PLI DVA)Regulatory Shared factors: Policy 1Watch: Treasury FEOC guidance; MHI PLI milestone reviews and penalties; Chinese licensing deals (Ford-CATL)
35%
10%
6 mo
Critical mineral price and supply shocks (Li, Ni, Co, graphite, REEs)Commodity Shared factors: Policy 0.4 · Aluminium 0.2 · Copper 0.2 · Electrical equipment 0.2Watch: lithium hydroxide futures; China graphite/REE export controls; Indonesian nickel policy
35%
8%
3 mo
Financing and sponsor balance-sheet riskFinancing Shared factors: Interest rates 0.7 · Policy 0.3Watch: DOE LPO / EIB loan status; sponsor credit spreads; JV unwinds
35%
5%
12 mo
Equipment supply and vendor dependence (Chinese tool makers, visas)Supply chain Shared factors: Electrical equipment 0.6 · Policy 0.4Watch: visa availability for vendor technicians (India/US); China equipment export restrictions
30%
5%
6 mo
Construction labour and immigration enforcementLabour Shared factors: Labour 0.8 · Policy 0.2Watch: Hyundai-LGES Georgia raid (Sep-2025) precedent; craft wages
25%
5%
4 mo
Utilities: power, water and green-power availabilityInterface Shared factors: Power price 0.5 · Grid queue 0.5Watch: substation readiness; RE PPA for EU carbon footprint rules
20%
3%
4 mo
Safety incidents (fires in plants/vehicles) and recallsESG Shared factors: Policy 0.5 · Labour 0.5Watch: recall notices; BIS/AIS-156 compliance; plant fire events
15%
3%
3 mo
Demand/policy whiplash (credit expiry, CO2 standard relaxation)Market Shared factors: Policy 0.7 · Oil 0.2 · Interest rates 0.1Watch: EV sales share by market; US 30D expiry effects; EU Automotive Package/CO2 flexibilities
45%
0%
12 mo
Chinese competition and price deflationMarket Shared factors: Policy 0.5 · Electrical equipment 0.5Watch: China LFP cell spot; EU/US/India tariff decisions; Chinese export volumes
45%
0%
0 mo

Market signals

What moves the case

Key variables with their typical range and what they hit in the model.

VariableTypical rangeAffects
Lithium hydroxide priceLFP ~0.55-0.6 kg LCE/kWh, NMC ~0.7 kg; +USD 10/kg ~ +USD 6-8/kWh cell cost; ~USD 15/kg in Oct-2026.8–80USD/kgOpex, Revenue
NickelNMC811 ~0.6-0.7 kg Ni/kWh; FRED USD 16,632/t (Jul-2026), +11% y/y.14,000–30,000USD/tOpex
AluminiumCathode foils, cans, enclosures, vehicle bodies.2,000–3,500USD/tOpex, Capex
CopperAnode foil ~0.5-0.8 kg/kWh plus ~60-80 kg per EV.7,000–14,000USD/tOpex
Battery manufacturing PPIUS price signal incl. tariffs.200–320indexRevenue
Cell/pack priceChinese LFP cells ~USD 50-60/kWh vs US/EU ~USD 90-120/kWh - estimate; drives competitiveness of localised plants.50–160USD/kWhRevenue, Margin
EV share of new car sales2025: China ~55%, Europe 28%, US <10%; India cars ~4-5% (estimate); global 2026e 28%.2%–65%Revenue, Utilization
Gigafactory utilisationGlobal cell capacity far exceeds demand outside top-tier players; <60% utilisation is loss-making for new entrants.20%–90%Margin
Show 4 more variables
VariableTypical rangeAffects
Production scrap / yield lossNew Western plants (Northvolt) suffered scrap of 30%+ during ramp vs <5% at CATL - estimate.3%–40%Opex, Schedule
Production incentive (45X / ACC-PLI)US 45X: USD 35/kWh cells + USD 10/kWh modules (FEOC limits under OBBBA); India ACC-PLI tied to 60% DVA.0–45USD/kWhRevenue, Margin
US 10-year TreasuryGreenfield gigafactories rely on DOE/EIB loans and project debt.3–6percentFinancing
INR per USDIndian cell plants import equipment (Chinese/Korean) and most materials.80–100INR/USDCapex, Opex

Price feeds (14)

SeriesSource / idUnitFrequency
Lithium hydroxide CIF CJK futuresLTH=FYahooUSD/kgdaily
Global price of NickelPNICKUSDMFREDUSD/tmonthly
Global price of AluminumPALUMUSDMFREDUSD/tmonthly
Global price of CopperPCOPPUSDMFREDUSD/tmonthly
PPI: Battery manufacturingPCU335911335911FREDindexmonthly
PPI: Storage batteries (ex lead-acid)WPU11790105FREDindexmonthly
PPI: Automobile, light truck and utility vehicle manufacturingPCU336110336110FREDindexmonthly
PPI: Motor vehicle electrical and electronic equipmentPCU336320336320FREDindexmonthly
Show 6 more feeds
SeriesSource / idUnitFrequency
PPI: Steel mill productsWPU1017FREDindexmonthly
PPI: Industrial electric powerWPU0543FREDindexmonthly
US 10-year Treasury yieldDGS10FREDpercentdaily
INR per USDDEXINUSFREDINR/USDdaily
USD per EURDEXUSEUFREDUSD/EURdaily
Global X Lithium & Battery Tech ETFLITYahooUSDdaily

Listed tickers (28)

Market context only: these prices tend to react first when a driver moves. Named for context; no affiliation.

Operators · 17

  • OLAELEC.NS Ola Electric (cell gigafactory + e-2W) NSE · IN
  • ATHERENERG.NS Ather Energy NSE · IN
  • TVSMOTOR.NS TVS Motor NSE · IN
  • BAJAJ-AUTO.NS Bajaj Auto NSE · IN
  • HYUNDAI.NS Hyundai Motor India NSE · IN
  • EXIDEIND.NS Exide Industries (Exide Energy cells) NSE · IN
  • ARE&M.NS Amara Raja Energy & Mobility NSE · IN
  • RELIANCE.NS Reliance Industries (battery giga-complex) NSE · IN
  • TSLA Tesla NASDAQ · US
  • GM General Motors NYSE · US
  • F Ford Motor NYSE · US
  • RIVN Rivian NASDAQ · US
  • VOW3.DE Volkswagen (PowerCo) XETRA · EU
  • BMW.DE BMW XETRA · EU
  • MBG.DE Mercedes-Benz (ACC shareholder) XETRA · EU
  • STLAM.MI Stellantis (ACC shareholder) Borsa Italiana · EU
  • 1211.HK BYD HKEX · APAC

Suppliers · 8

  • ALB Albemarle NYSE · US
  • SQM SQM NYSE · LATAM
  • UMI.BR Umicore Euronext Brussels · EU
  • 300750.SZ CATL SZSE · APAC
  • 373220.KS LG Energy Solution KRX · APAC
  • 006400.KS Samsung SDI KRX · APAC
  • 096770.KS SK Innovation (SK On) KRX · APAC
  • 6752.T Panasonic Holdings TSE · APAC

Consumers · 2

  • TMPV.NS Tata Motors Passenger Vehicles (Tata.ev, JLR; Agratas parent group) NSE · IN
  • M&M.NS Mahindra & Mahindra NSE · IN

Proxys · 1

  • LIT Global X Lithium & Battery Tech ETF NYSE Arca · US

KPIs, regions and who builds

KPIs the pack tracks

  • Nameplate GWh and utilisation (%)
  • Capex per GWh
  • Scrap rate / yield (%)
  • Cell cost (USD/kWh)
  • Energy density (Wh/kg)
  • Months from groundbreak to SOP
  • OEM qualification milestones
  • Vehicle plant capacity utilisation (%)
  • EV gross margin per unit
  • Domestic value addition (%)
  • Incentive accrual (45X/PLI) vs plan
  • Warranty claims / recall rate

Regional notes

IndiaACC-PLI (Rs 18,100 crore for 50 GWh) progress lagged with penalties for missed milestones (Ola, Reliance, Rajesh Exports); private non-PLI cell plants (Agratas, Amara Raja, Exide) ramping 2025-27; PM E-DRIVE (Rs 10,900 crore) and SPMEPCI (import duty concession for >=USD 500m investment) support EVs; China's 2025 rare-earth magnet curbs hit e-2W output; INR ~96/USD inflates imported equipment cost.
United StatesOBBBA ended consumer EV credits (30-Sep-2025) but kept 45X with FEOC restrictions; automakers took large EV write-downs and redirected cell capacity to ESS/LFP (often licensing CATL technology); tariffs on Chinese EVs/batteries; DOE loans under review.
EuropeEV share 28% (2025) under CO2 standards; Battery Regulation (carbon footprint, recycled content, passports); Northvolt failure and ACC pauses; Chinese plants in Hungary/Spain; proposed Automotive Package would loosen 2035 target but EV share still >90% by 2035 per IEA.
Middle EastSaudi Arabia (Lucid, Ceer, battery plans) and Morocco (Chinese cathode/cell plants) emerging hubs.

Who builds and operates

Named for context; no affiliation. These are public market participants drawn from the research behind the pack. They are not Capibud clients or partners.

Operators · 13

  • Agratas (Tata Group) Mumbai · IN20 GWh Sanand cell plant (~Rs 13,000 crore) and 40 GWh Somerset, UK gigafactory for Tata.ev/JLR.
  • Ola Electric Bengaluru · INACC-PLI 20 GWh allocation; Krishnagiri 4680 cell gigafactory started at ~5 GWh; e-2W market-share losses and losses weigh on funding.
  • Reliance New Energy Mumbai · INACC-PLI 10 GWh + additional allocation; Jamnagar battery giga-complex (LFP, sodium-ion via Faradion).
  • Amara Raja / Exide Energy Tirupati / Bengaluru · INNon-PLI Li-ion cell plants (Telangana 16 GWh; Bengaluru 12 GWh phased).
  • Tata Motors PV / M&M / Hyundai / Maruti Suzuki Mumbai / Gurugram · INIndian EV car OEMs; Maruti e-Vitara exports; SPMEPCI encourages global OEM local plants.
  • TVS / Bajaj / Ather / Hero Various · INe-2W leaders; PM E-DRIVE incentives and rare-earth magnet supply shocks (2025).
  • Tesla Austin · USGigafactories Texas/Nevada/Berlin/Shanghai; capex USD 8.5bn in 2025 (USD 11.3bn 2024); LFP cell lines for Megapack.
  • General Motors / Ultium Cells (LGES) Detroit · USUltium plants re-tooled toward LFP and ESS after 2025 EV demand reset.
  • Ford / BlueOval SK Dearborn · USBlueOval SK JV unwound (2025); Kentucky/Tennessee plants re-scoped; LFP plant in Michigan with CATL licence.
  • Hyundai Motor Group Metaplant / Toyota NC / Panasonic Kansas Georgia / NC / Kansas · USLarge Southeastern US EV/battery investments; immigration raid at Hyundai-LGES Georgia site (Sep-2025) delayed ramp.
  • VW PowerCo / ACC (Stellantis-Mercedes-Total) / Verkor Salzgitter / Bordeaux / Grenoble · EUPowerCo Salzgitter/Valencia/St Thomas; ACC paused German/Italian plants; Verkor Dunkirk.
  • Northvolt (assets acquired by Lyten) Stockholm · EULargest Swedish industrial bankruptcy (Mar-2025) - cautionary case on ramp/yield.
  • CATL / BYD / CALB / Gotion / EVE Ningde / Shenzhen · APACChinese leaders expanding in Hungary (Debrecen), Spain (Stellantis-CATL Zaragoza), Indonesia, Morocco.

Suppliers · 11

  • Wuxi Lead / Yinghe / Hirano / PNT OEM · APACElectrode coating, winding/stacking and formation equipment (mostly Chinese/Korean).
  • Albemarle / SQM / Ganfeng / Tianqi / Pilbara Materials · USLithium chemicals.
  • Umicore / EcoPro / POSCO Future M / L&F / BASF Materials · EUCathode materials; Umicore scaled back battery materials capex 2024-25.
  • Epsilon Advanced Materials / Himadri / Altmin / Hindalco Materials · INIndian anode, LFP cathode, aluminium foil suppliers.
  • Asahi Kasei / SEMCORP / Toray Materials · APACSeparators.
  • Durr / ABB / Siemens / Bosch Rexroth OEM · EUAutomation, dry-room HVAC, paint shops for vehicle plants.
  • Exyte / Munters OEM · EUDry-room and cleanroom systems.
  • L&T / Tata Projects / Shapoorji / Kiewit / Walbridge EPC · INGigafactory and auto-plant EPC.
  • Redwood Materials / Li-Cycle / Attero / Lohum Services · USRecycling and closed-loop materials.
  • Sona Comstar / Uno Minda / Tata AutoComp OEM · INEV traction motors, BMS and packs; rare-earth magnet exposure.
  • Siemens Digital Industries / Dassault / Rockwell Software · EUMES, digital twin and quality analytics for ramp/yield.

Customers · 5

  • Passenger EV buyers BEV/PHEV carsGlobal EV sales 2026e 23m (28% share); Europe ~1 in 3 cars.
  • Two- and three-wheeler riders e-2W/e-3WIndia e-2W sales grew >30% y/y in Q1-2026; SE Asia doubled.
  • Commercial fleets (buses, trucks, last-mile) commercial EVElectric trucks 9% of global truck sales 2025; India PM e-Bus Sewa.
  • Stationary storage (BESS) integrators ESS cellsFastest-growing outlet for LFP cells; US EV lines converting to ESS.
  • Automakers buying cells (offtake) cell offtakeLong-term supply agreements set utilisation of independent cell makers.

Project template

Work breakdown

Share of total duration per step; steps overlap where predecessors allow, as the bars show. O / ML / P are optimistic, most-likely and pessimistic multipliers on each step's duration; the hatched tail is the pessimistic case.

IDStep & timingShareO / ML / P
A100Offtake agreements, technology/licensing partner and business caseDevelop · factors: Policy, Interest rates, Oil15%0.9 / 1 / 1.6
A110Incentive approvals (45X/DOE LPO, ACC-PLI, state packages) and financingDevelop · factors: Policy, Interest rates15%0.85 / 1 / 1.8
A120Land, environmental clearance, power and water connectionsDevelop · factors: Policy, Grid queue20%0.9 / 1 / 1.6
B100Process and facility design (dry rooms, formation, HVAC, solvent recovery)Engineer · EPC · factors: Labour15%0.9 / 1 / 1.4
C100Process equipment orders (mixing, coating, assembly, formation)Procure · OEM · factors: Electrical equipment, Policy35%0.9 / 1 / 1.5
C110Facility long-lead: substations, chillers, dry-room AHUs, NMP recoveryProcure · OEM · factors: Electrical equipment, Steel, Copper30%0.9 / 1 / 1.5
C120Raw-material supply contracts (Li, CAM, anode, electrolyte, foils)Procure · factors: Policy, Aluminium, Copper, Electrical equipment20%0.9 / 1 / 1.6
D100Civil works and building shellConstruct · EPC · factors: Construction materials, Steel, Labour30%0.9 / 1 / 1.4
D110MEP, dry rooms and utilities installationConstruct · EPC · factors: Labour, Copper, Electrical equipment30%0.9 / 1 / 1.5
D120Equipment installation and line integrationConstruct · OEM · factors: Labour, Electrical equipment20%0.9 / 1 / 1.6
E100Pilot production, cell validation and customer (OEM) qualificationCommission · factors: Labour, Electrical equipment20%0.9 / 1 / 2
E110SOP and volume ramp to nameplateCommission · factors: Labour, Policy, Oil25%0.9 / 1 / 2.2

Cost breakdown

Share of capex by line, with the commodity exposure of each line (the share of that line that moves with the commodity).

  • Process equipment (electrode, assembly, formation/aging)52%
    Equipment
    • Electrical equipment 70%
    • Policy 30%
  • Building shell and civil works13%
    Construction
    • Construction materials 50%
    • Steel 50%
  • Dry rooms, HVAC, solvent recovery and utilities12%
    Equipment
    • Electrical equipment 50%
    • Copper 30%
    • Steel 20%
  • Construction and installation labour8%
    Labour
    • Labour 100%
  • Pre-production ramp costs (scrap, training, qualification)5%
    Commissioning
    • Labour 50%
    • Aluminium 25%
    • Copper 25%
  • Engineering, licences and PMC4%
    Engineering
    • Labour 100%
  • Land, power/water connections and approvals3%
    Develop
    • Grid queue 50%
    • Policy 50%
  • Financing, insurance and IDC3%
    Indirects
    • Interest rates 100%

Financial template

Revenue model

Cell makers sell cells/packs under multi-year OEM or ESS offtake agreements with metal-price pass-through plus production incentives (45X USD 35/kWh cells, India ACC-PLI); OEM plants earn vehicle margins dependent on volume and battery cost; materials makers earn processing fees over metal indices.

Margin driver

Gigafactory utilisation

Ramp-up

3 years to steady state

How Capibud uses this pack

A pack is a starting position, not a forecast. When a EV & battery gigafactories decision opens in Capibud, pack v1.0.0 is copied in and pinned to that decision. The 13 parameters, 10 swing factors and templates the committee saw stay attached to the decision record, even after the pack is next refreshed.

Parameter ranges and WBS durations seed the P50, P80 and P90 for capex, schedule and value. Your own estimates, vendor quotes and actuals replace pack defaults line by line, and the record shows which numbers are still defaults.

Each swing factor is wired to shared factors; here the heaviest are policy, electrical equipment, labour and interest rates. A move in one factor hits every exposed project in the same scenario, which is how the capital committee sees concentration across a book rather than project by project.

The 14 price feeds and 28 listed tickers feed the brain, which watches for drivers moving outside their pack range and drafts the change for a person to review.

Shared factors behind this pack's swing factors

  • Policy
  • Electrical equipment
  • Labour
  • Interest rates
  • Oil
  • Aluminium
  • Copper
Relative weight: probability × impact × driver weight, summed over swing factors.

Capex tied to a shared factor

  • Electrical equipment42.4%
  • Policy17.1%
  • Labour14.5%
  • Steel8.9%
  • Construction materials6.5%
  • Copper4.9%
  • Interest rates3%
Share of total capex, from the cost breakdown and its commodity exposures.

Sources

Every link opens the original source in a new tab. Values marked as estimates are informed estimates by the Capibud research team.

  1. iea.orghttps://www.iea.org/reports/global-ev-outlook-2026/executive-summary
  2. iea.orghttps://www.iea.org/reports/world-energy-investment-2025/executive-summary
  3. en.wikipedia.orghttps://en.wikipedia.org/wiki/Northvolt
  4. en.wikipedia.orghttps://en.wikipedia.org/wiki/One_Big_Beautiful_Bill_Act
  5. en.wikipedia.orghttps://en.wikipedia.org/wiki/Inflation_Reduction_Act
  6. en.wikipedia.orghttps://en.wikipedia.org/wiki/Gigafactory
  7. en.wikipedia.orghttps://en.wikipedia.org/wiki/Lithium-ion_battery
  8. data.sec.govhttps://data.sec.gov/api/xbrl/companyconcept/CIK0001318605/us-gaap/PaymentsToAcquirePropertyPlantAndEquipment.json
  9. fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PCU335911335911
  10. fred.stlouisfed.orghttps://fred.stlouisfed.org/series/PNICKUSDM

Bring us one real decision in EV & battery gigafactories.

We start it from the EV & battery gigafactories pack v1.0.0: 13 parameters, 10 swing factors and the 12-step project template, pinned to your decision.